My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
08-09-11 Packet
>
6C (1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:02:19 PM
Creation date
8/5/2011 11:34:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LASALLE SQUARE <br />PHASE 1 <br />IMPROVEMENTS TO BONDS AVENUE EXTENSION AND NORTH /SOUTH STREET <br />and DEMOLITION TO RESTAURANT PROPERTY <br />830 feet of New R/W and Street <br />Preliminary Cost Estimate <br />Revised June 7, 2011 <br />ABONMARCHE CONSULTANTS, INC. <br />- 750 Lincoln Way East <br />South Bend, IN 46601 <br />F: \Projects \l 1 -0203 \[Preliminary Estimates 06 -07- 11.x1sjTotal Phase 1 <br />DESCRIPTION <br />ESTIMATED COST <br />Phase 1 - North /South Street Adjacent to Library <br />$98,295 <br />Phase 1 - Bonds Avenue Extension <br />$179,260 <br />Phase 1 - Demolition to Restaurant Site <br />$30,000 <br />Subtotal <br />$307,555 <br />Contingency, 10% <br />$30,800 <br />Engineering and Surveying (Estimated) <br />$60,000 <br />$398,355 <br />ABONMARCHE CONSULTANTS, INC. <br />- 750 Lincoln Way East <br />South Bend, IN 46601 <br />F: \Projects \l 1 -0203 \[Preliminary Estimates 06 -07- 11.x1sjTotal Phase 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.