My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6A (2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
08-09-11 Packet
>
6A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:04:22 PM
Creation date
8/5/2011 11:23:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1200 COUNTY -Cm BUILDING <br />227W. JEFFERSON BOULEVARD <br />SOUTH BEND, INDIANA 46601 -1830 <br />t, <br />JUL 2 4 2011 <br />PHONE 574 /235 -9371 <br />FAX 574/235 -9021 <br />TDD 574/ 235 -5567 <br />CITY OF SOUTH BEND STEPHEN J. LUECKE, MAYOR <br />COMMUNITY & ECONOMIC DEVELOPMENT <br />JEFFREY V GIBNEY <br />EXECUTIVE DIRECTOR <br />Property Address: 710 S. 30`h St. <br />Property Owners: Patricia Metz 232 -5814 <br />Date: July 20, 2011 <br />Inspector: Jeff Young <br />Program: Home Repair& Improvement Program <br />Bid Specifications I <br />Roof <br />1 fs' Tear -off all roof coverings down to bare wood deck on all surfaces. Replace or repair all <br />deteriorated framing members and sheeting. On all areas install 7/16" OSB sheathing over decking to provide <br />level and adequate nailing surface for new roofing, then with new "TITANIUM -UDL" Synthetic Roof <br />Underlayment or approved equal, premium (1 -1 /2 ") metal drip edge along all roof edges, appropriate pipe <br />boots and Owens Corning or Cora -Vent brand corrugated vinyl roof ridge vent for proper attic ventilation, <br />needed transition flashing, step and counter flashing at vertical transitions. Install Ice & Water shield along <br />roof eaves and in valleys. Install 235 -240 lb. Oakridge dimensional, or GAF Timberline dimensional or <br />approved equal on all pitched roof surfaces a one ply EPDM rubberized roof system or an approved equal on <br />low slope areas. <br />Cap shingles are to be an exact color match and are to be manufactured by the same company as shingles. <br />Gutters: <br />2 1 Furnish and install new white or brown (to match existing fascia & soffit).027 ga. aluminum <br />seamless gutters and downspouts on home. Gutters and downspouts shall be hung and secured in a manner <br />that effectively carries away storm water. Down spouts shall be installed so all gutters are serviced by at least <br />one. Install minimum 60" downspout extension with elbows at terminal ends of each downspout, all are to <br />extend at least to lawn areas. Cover all with new metal leaf guard (expanded aluminum. 4' sections with rigid <br />mounting flanges) <br />Plumbing: <br />3. Remove existing electric water heater and haul from site. Install new 40 gallon electric <br />water heater with minimum 10 year manufactures warranty Water heater shall include new shut off <br />valves on hot and cold water lines, pressure relief valve and copper or galvanized drain pipe installed <br />within 6" of concrete floor. Installation shall include all hardware and needed electrical circuitry for <br />proper installation and function. Replace or repair all needed fittings, pipe, supply, and return lines <br />Reset 4" cast iron stink pipe in basement area at iron to plastic transition, replace existing coupling <br />with a new Fernco flexable type coupling <br />$ _� b ! TOTAL <br />Company Name: Date: <br />COMMUNITY DEVELOPMENT ECONOMIC DEVELOPMENT FINANCIAL & PROGRAM <br />PAMELA C. MEYER DONALD E. INKS MANAGEMENT <br />574/235 -9660 5741235 -9371 ELIZABETH LEONARD <br />FAX: 574/235 -9697 574/235 -9371 <br />
The URL can be used to link to this page
Your browser does not support the video tag.