My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-19-02 Redevelopment Commission Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2000-2009
>
2002
>
07-19-02 Redevelopment Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 12:36:02 PM
Creation date
8/2/2011 4:07:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
14 <br />South Bend Redevelopment Commission <br />Regular Meeting —July 19, 2002 <br />previous tax abatements. The property is <br />properly zoned for the proposed project. <br />The property is located in the Airport <br />Economic Development Area, which is a <br />Tax Incremental Allocation Area; therefore, <br />the petition for personal property tax <br />abatement must first be approved by the <br />South Bend Redevelopment Commission. A <br />review of the Tax Abatement Ordinance <br />finds that the petitioner meets the <br />qualifications for a five year personal <br />property tax abatement. <br />Based on a total equipment cost of $350,000 <br />the cost of the tax abatement is as follows: <br />Ms. Davis introduced Ms. Sheral Litell of <br />CB Richard Ellis representing Ely Chemical <br />Co., LTD. which is located in England. <br />Ms. Litell reported that there was a lot of <br />competition with Michigan and other sites <br />related to this project. Ely Chemical has a <br />company in Illinois which was also a <br />considered site. They produce de -icer for <br />airports and manufacturer gel used in <br />sonograms. Ely Chemical recognizes the <br />South Bend location as being second in the <br />7 <br />Estimated taxes <br />over 5 years <br />Without <br />$36,304 <br />abatement <br />With 5 -year <br />$12,426 <br />abatement <br />Estimated <br />$23,879 <br />cost of 5 -year <br />abatement <br />Ms. Davis introduced Ms. Sheral Litell of <br />CB Richard Ellis representing Ely Chemical <br />Co., LTD. which is located in England. <br />Ms. Litell reported that there was a lot of <br />competition with Michigan and other sites <br />related to this project. Ely Chemical has a <br />company in Illinois which was also a <br />considered site. They produce de -icer for <br />airports and manufacturer gel used in <br />sonograms. Ely Chemical recognizes the <br />South Bend location as being second in the <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.