My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6D (5)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
07-26-11 Packet
>
6D (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:06:47 PM
Creation date
7/22/2011 2:32:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Geri Hathaway <br />06 July 2011 <br />Page 2 of 2 <br />If BSA LifeStructures were to be hired by Data Realty for full architectural design, the fee for this <br />project could be reduced to SV,,5M due to reduced coordination on the project. <br />The schedule for the project we understand is fairly aggressive and we will work with Data <br />Realty's architects and engineers to make the fagade addition as painless as possible while <br />keeping the overall project on schedule. <br />If the above - referenced fee is acceptable for the work outlined, BSA LifeStructures will require an <br />executed short form letter agreement which will be sent after all parties agree to the scope and <br />fee. We would like to thank you for this opportunity to assist your organization in ignitinglife <br />sciences growth in downtown South Bend and look forward to working with you in the future. <br />Thanks again. <br />Sincerely, <br />C )_ <br />Chris W. Lake, AIA, LEED AP <br />Principal -in- Charge <br />
The URL can be used to link to this page
Your browser does not support the video tag.