Laserfiche WebLink
Power Company providing a Stand -By Power Source from the Power Company's Kankakee <br />Substation. Both the Express Feeder Line and the and Stand -By Power Source (also known as <br />"Alternative Feed Services ") shall at all times at no additional cost to Company have the <br />capability to provide to Company Nine and six - tenths Megawatts ( "9.6MW ") of electric power. <br />(b) In order to compensate Company for the Commission's requirement of the <br />Enhancement Number 1, the Company shall provide evidence reasonably satisfactory to <br />Commission of the cost of Enhancement Number 1 (ie: utilizing the Means Cost Estimating <br />Method and providing the specific references to unit prices of the base building separate from <br />Enhancement Number 1), and the Commission shall provide a list of proposed site amenities <br />listed on Exhibit "F" ( "Site Amenities "). Each Site Amenity shall be assigned a value, and the <br />Commission shall provide at Company's request the documentation for reaching such value. <br />The Commission and Company shall mutually agree upon and select Site Amenities whose value <br />is equal to or less than the value of the Enhancements. The Commission shall then provide at its <br />cost completion of those Amenities selected by the Company. <br />(c) The Commission shall provide, at its own expense, a generator (including switch <br />gear and transformers) reasonably satisfactory to Company on Company's property to be used as <br />a backup power source by the Company at this location. The City shall enter into a Use, <br />Operations and Management Agreement (which is identified as Exhibit H to this Agreement and <br />incorporated herein by reference) with Company on reasonable commercial terms which will <br />permit Company the exclusive right to use the backu. The Company will have the right to <br />purchase the generator from the City on the seventh (7t ) anniversary of the closing date of this <br />Agreement for the total purchase price of one dollar ($1.00), subject to any action required of the <br />Commission to dispose of property under State law. <br />(d) The Commission shall have an option in its absolute discretion at its cost to <br />design, bid, and construct, Enhancement Number 2. Company and Commission shall cooperate <br />with each other including their respective architectural and construction firms to complete the <br />construction of Enhancement Number 2. <br />(e) The Commission shall provide access to the Property by public right -of -ways <br />illustrated on Exhibit "G" (the Company's proposed building is cross - hatched). <br />(f) The Commission shall support any applications filed by the Company for: (i) a <br />personal property tax exemption for enterprise information technology equipment as described in <br />I.C. 6- 1.1- 10 -44. <br />(g) Upon written request from Company, and provided that the Company has <br />fulfilled its obligations in paragraph 6(c), Commission will provide a release of the <br />Reconveyance conditions of the limited warranty deed. <br />(h) The Commission will ensure the Dark Fiber Loop operated by the St. Joe Valley <br />Metro Net, Inc. will access the park and provide dual feeds to the Property at the outside <br />boundary line of the Property in locations satisfactory to Company. The Company shall be <br />responsible for all lateral feeds from the outside property line to the Company's building. <br />3 <br />