Laserfiche WebLink
City ofSouth Bend <br />South Bend, Indiana <br />Ignition Park <br />15350001 <br />07.20.11 <br />PREDESIGN PPC <br />Component <br />PHASE [A <br />Improvements <br />Stull Street Blvd <br />Stull Street Resurface <br />Circle Drive <br />Scott Street <br />Finish Grade and Seed <br />Landscape Allowance <br />Utilities <br />Electric Duct Bank <br />Routing Repairs <br />Water Main <br />Sanitary Sewer <br />Communication <br />Natural Gas <br />Storm Drainage <br />PHASE IA Subtotal <br />Contingency 15% <br />PHASE IA Construction Cost <br />Project Design and Permitting Fees <br />Phase Ut Probable Prolect Cost <br />Unit <br />Quantity <br />Material Cost <br />LF <br />425 <br />$290.00 <br />LF <br />400 <br />$110.00 <br />LF <br />900 <br />$295.00 <br />LF <br />425 <br />$150.00 <br />LS <br />1 <br />$25,000.00 <br />LS <br />1 <br />$525,000.00 <br />LF <br />3800 <br />$100.00 <br />LF <br />2800 <br />$70.00 <br />LF <br />3400 <br />$75.00 <br />LF <br />1750 <br />$75.00 <br />LF <br />4200 <br />$20.00 <br />LF <br />1750 <br />$40.00 <br />LS <br />1 <br />$250,000.00 <br />Labor <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />LS 1 $0.00 $128,000.00 <br />Total <br />$123,250.00 <br />$44,000.00 <br />$265,500.00 <br />$63,750.00 <br />$25,000.00 <br />$525,000.00 <br />$380,000.00 <br />$196,000.00 <br />$255,000.00 <br />$131,250.00 <br />$84,000.00 <br />$70,000.00 <br />$250,000.00 <br />$2,412,7SD.Bo <br />$361,913.00 <br />$2,774,663.00 <br />$128,000.00 <br />SZ.902.663.00 <br />