Laserfiche WebLink
11 <br />ARCHITECTURE <br />DESIGN GROUP <br />July 20, 2011 <br />Jeffrey V. Gibney <br />Executive Director <br />City of South Bend <br />Community and Economic Development <br />227 West Jefferson Boulevard, Suite 1200S <br />South Bend, IN 46601 -1830 <br />RE: CENTURY CENTER ISLAND PARK <br />EAST FOUNDATION WALL DRAINAGE SYSTEM <br />PROJECTED COST OF CONSTRUCTION <br />Dear Jeff: <br />& C, (7) <br />Due to the existing conditions of the Island Park perimeter east walls, the newly completed pavement <br />resurfacing has experienced settlement due to the loss of the supporting sub -grade fill from the flow of <br />storm water through the walls. The area appears to be along the southern half of the perimeter east walls. <br />Architecture Design Group, Inc. (ADG) has prepared preliminary design sketches to address the situation <br />with a new combination surface and sub -grade collection and drainage system. <br />We have shared our preliminary design sketches with two local general contracting firms to estimate the <br />costs of construction for the drainage system. The projected cost of construction for the work is $28,500, <br />and will include all contractor general conditions, demolition, earthwork, and concrete surfacing <br />replacement. <br />We recommend a not -to- exceed cost of construction equal to $30,000. <br />Please contact me should you have any questions. <br />Respectfully submitted, <br />ARCHITECTURE DESIGN GROUP, INC. <br />I �-:LTWL' __ <br />William R. Lamie RA, AIA <br />Principal <br />ACCEPTED BY: <br />DATE: <br />922 E. Wayne Street <br />South Bend, IN 46617 <br />tel 574.288.6626 <br />fax 574.288.6624 <br />Jeffrey V. Gibney, Executive Director <br />City of South Bend <br />Community and Economic Development <br />