My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-17-04 Redevelopment Commission Minutes
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
2000-2009
>
2004
>
09-17-04 Redevelopment Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 12:10:51 PM
Creation date
7/21/2011 2:32:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redevelopment Commission Meeting <br />Regular Meeting — September 17, 2004 <br />6. NEW BUSINESS (CONT.) <br />D. South Bend Central Development Area <br />(1) Commission approval requested for <br />proposal to prepare designs and <br />specifications for moving water and <br />electrical services at the Hotel LaSalle in <br />the South Bend Central Development <br />Area. <br />Mr. Mathia noted that on June 18, 2004 the <br />Redevelopment Commission signed a letter <br />proposal with Stephen Eddy to provide <br />services as a mechanical engineer to inspect <br />the HVAC system in the Hotel LaSalle and <br />to make recommendations for this winter. <br />During his inspection, it was determined that <br />additional assistance was needed for the <br />preparation of designs and specifications for <br />filling the vaults under the sidewalk. The <br />additional assistance is needed to prepare <br />specifications to move the electrical and <br />water services for the hotel. Because of his <br />familiarity with the hotel, Mr. Eddy was <br />requested to submit a proposal to prepare <br />those specifications. In his proposal the cost <br />for examining and preparing bid <br />specifications for the water service is <br />$1,300.00 and for the electrical service it is <br />$1,200.00. The total is $2,500.00. <br />The Redevelopment Commission is <br />requested to: (1) approve the attached letter <br />proposal from Mr. Eddy; and (2) authorize <br />funding up to $2,800.00 for the work to <br />complete the review and specifications for <br />moving the electrical service and the water <br />main. The additional funds are to cover any <br />contingencies. Staff recommends approval <br />of the proposal and the funding amount. <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.