Laserfiche WebLink
REGULAR MEETING JUNE 27,2011 214 <br /> Non-Discrimination Commitment Form was completed <br /> Five percent(5%)Bid Bond was submitted <br /> BID: <br /> Base Bid $199,276.00 <br /> Environmental Allowance $10,000.00 <br /> Total $209,276.00 <br /> Unit Prices <br /> EI ACM Pipe&Duct Wrap LFT $30.00 <br /> E2 ACM—Fiber Mat SFT $30.00 <br /> E3 ACM—Floor Tile&Mastic SFT <br /> C&E EXCAVATING,INC. <br /> 53767 County Road 9 <br /> Elkhart,Indiana 46514 <br /> Bid was signed by:Mr.Ed Bessinger <br /> Non-Collusion Affidavit was in order <br /> Non-Discrimination Commitment Form was completed <br /> Five percent(5%)Bid Bond was submitted <br /> BID: <br /> Base Bid $225,000.00 <br /> Environmental Allowance $10,000.00 <br /> Total $235,000.00 <br /> Unit Prices <br /> E1 ACM Pipe&Duct Wrap LET $30.00 <br /> E2 ACM—Fiber Mat SFT $30.00 <br /> E3 ACM—Floor Tile&Mastic SFT $3.00 <br /> Upon a motion made by Mr. Littrell, seconded by Mr. Inks and carried, the above bids were <br /> referred to Engineering and Economic Development for review and recommendation. <br /> OPENING AND AWARD OF QUOTATIONS AND APPROVE CONTRACT -- MAIN <br /> STREET AND JEFFERSON BOULEVARD STREETSCAPE IMPROVEMENTS—PROJECT <br /> NO. 111-047(SBCDA TIF) <br /> Mr.Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br /> the above referenced project.The following Quotations were opened and read: <br /> PEMBERTON DAVIS <br /> 917 Union Street <br /> Mishawaka,Indiana 46544 <br /> Quotation was submitted by Pemberton Davis <br /> QUOTATION: $7,900.00 <br /> CONCORD ELECTRIC <br /> 30753 Old US 20 <br /> Elkhart,Indiana 46514 <br /> Quotation was submitted by Mr.Rick Cave <br /> QUOTATION:$9,766.00 <br /> MARTELL ELECTRIC,LLC <br /> 4601 Cleveland Road <br /> South Bend,Indiana 4662$ <br /> Quotation was submitted by Martell Electric <br /> QUOTATION:$19,250.00 <br /> Upon a motion made by Mr. Littrell, seconded by Mr. Inks and carried, the above Quotations <br /> were referred to Engineering for review and recommendation. After reviewing those quotations, <br /> Mr. Rob Nichols, Engineering recommended that the Board award the contract to the lowest <br />