My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/27/11 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2011
>
06/27/11 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2014 10:54:45 AM
Creation date
7/11/2011 4:05:28 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
6/27/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
........ .............................. <br /> SPECIAL MEETING .TUNE 30.2011 224 <br /> Bid was signed by:Mr.Alan McComb <br /> Non-Collusion Affidavit was in order <br /> Non-Discrimination Commitment Form was completed <br /> Ten percent(10%)Bid Bond was submitted <br /> BID: <br /> Base Bid $2,005,000.00 <br /> Base Bid Plus All Alternates $2,339,700.00 <br /> Alternate 1 $0.00 <br /> Alternate 2 ($39,000.00) <br /> Alternate 3 $36,300.00 <br /> Alternate 4 $4,700.00 <br /> Alternate 5 $293,000.00 <br /> Unit Prices <br /> Excavation and removal of Unsatisfactory Soils $35.00/Sq Yd <br /> Placement and Compaction of Engineered Fill Below Planned $25.00/Sq Yd <br /> Subgrade <br /> BROWN&BROWN GENERAL CONTRACTORS INC. <br /> PO BOX 487 <br /> 124 South Elkhart Street <br /> Bid was signed by:Mr, Eric Brown <br /> Non-Collusion Affidavit was in order <br /> Non-Discrimination Commitment Form was completed <br /> Five percent(5%)Bid Bond was submitted <br /> BID: <br /> Base Bid $2,027,000.00 <br /> Base Bid Plus All Alternates $2,376,480.00 <br /> Alternate 1 $1,500.00 <br /> Alternate 2 ($41,000.00) <br /> Alternate 3 $42,700.00 <br /> Alternate 4 $9,350.00 <br /> Alternate 5 $295,900.00 <br /> Unit Prices <br /> Excavation and removal of Unsatisfactory.Soils $6.25/Sq Yd <br /> Placement and Compaction of Engineered Fill Below Planned $12.00/Sq Yd <br /> Subgrade <br /> ANCON CONSTRUCTION CO. INC <br /> 2146 Elkhart Road <br /> Goshen,Indiana 46526 <br /> Bid was signed by: Mr.John Place <br /> Non-Collusion Affidavit was in order <br /> Non-Discrimination Commitment Form was completed <br /> Five percent(5%)Bid Bond was submitted <br /> BID: <br /> Base Bid $2,061,050.00 <br /> Base Bid Plus All Alternates $2,402,500.00 <br /> Alternate 1 $4,800.00 <br /> Alternate 2 ($57,300.00) <br /> Alternate 3 $36,350.00 <br /> Alternate 4 $6,000.00 <br /> Alternate 5 $294,300.00 <br /> Unit Prices <br /> Excavation and removal of Unsatisfactory Soils $38.00/Sq Yd <br /> Placement and Compaction of Engineered Fill Below Planned $25.00/Sq Yd <br /> Subgrade <br /> Ms. Greene asked if anyone was present from Harold McComb & Son, Inc. She noted that there <br /> were two cross-outs on their bid and she needed someone to verify that they submitted the bid <br /> with the changes.Mr. Larry Easterday stated he was from that company and could verify he had <br />
The URL can be used to link to this page
Your browser does not support the video tag.