Laserfiche WebLink
REGULAR MEETING JUNE 13, 2011 200 <br /> of$13,800.00. Therefore, Mr. Littrell made a motion that the recommendation be accepted and <br /> the quotation be awarded as outlined above. Mr. Inks seconded the motion, which carried. <br /> AWARD_.. QUOTATION - CURB AND SIDEWALK PROGRAM — RENTING AND <br /> OPERATOR OF CURB MACHINE—PROJECT NO. 111-040 <br /> Mr. Robert Nichols, Engineering, advised the Board that quotations were received and opened <br /> for the above referenced project. After reviewing those quotations, Mr. Nichols recommended <br /> that the Board award the contract to the lowest responsive and responsible bidder, Moore's <br /> Concrete, Inc., 313 West Jefferson Street, Lakeville, Indiana 46536, in the amount of$7.00 per <br /> linear foot, not to exceed $5,600.00 per block. Therefore, Mr. Gilot made a motion that the <br /> recommendation be accepted and the quotation be awarded as outlined above. Mr. Inks seconded <br /> the motion, which carried. <br /> TABLE AWARD OF QUOTATION — CURB AND SIDEWALK PROGRAM --- TREE <br /> REMOVAL—PROJECT NO. 111-040 <br /> Mr. Robert Nichols, Engineering, requested the Board table the above award until the next Board <br /> of Works meeting. Therefore, Mr. Gilot made a motion that the award of the quotation be tabled. <br /> Mr. Inks seconded the motion, which carried. <br /> APPROVE CHANGE ORDER NO. 3 -- MEMORIAL HOSPITAL STREETSCAPES <br /> IMPROVEMENTS —PROJECT NO. 109-091 (MEDICAL TIF) <br /> Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 3 on behalf <br /> of Walsh & Kelly, Inc., 24358 State Road 23, South Bend, Indiana 46614, indicating the <br /> Contract amount be increased by $22,873.00 for a modified Contract sure, including this Change <br /> Order, in the amount of$2,175,462.59. Upon a motion made by Mr. Littrell, seconded by Mr. <br /> Inks and carried, the Change Order was approved. <br /> APPROVE CHANGE ORDER NO. 1 — COVELESKI STADIUM IMPROVEMENTS — <br /> SYNTHETIC TURF PLAYING SURFACE—PROJECT NO. 110-008J SBCDA TIF <br /> Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br /> of J.E.M. Morris Construction, Inc., 49 West 102 U.S. Route 30, Big Rock, Illinois 60511, <br /> indicating the Contract amount be increased by $11,649.22 for a modified Contract sum, <br /> including this Change Order, in the amount of $978,149.22. Upon a motion made by Mr. <br /> Littrell, seconded by Mr. Inks and carried, the Change Order was approved. <br /> APPROVE CHANGE ORDER NO. I — DEMOLITION OF FORMER FRED'S <br /> TRANSMISSION AND CLUTCH.—PROJECT NO. 110-043 (SBCDA TIF) <br /> Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br /> of Indiana Earth, Inc., 10343 McKinley Highway, Osceola, Indiana 46561, indicating the <br /> Contract amount be increased by $29,734.01 for a modified Contract sum, including this Change <br /> Order, in the amount of $216,708.01. Mr. Villa noted the increase was due to the discovery of <br /> five (5) buried underground storage tanks that had to be removed. Upon a motion made by Mr. <br /> Littrell, seconded by Mr. Inks and carried, the Change Order was approved. <br /> APPROVE CORRECTED CHANGE ORDER NO. 1 — COVELESKI STADIUM <br /> IMPROVEMENTS — MAIN FACILITY REHABILITATION PROJECT NO. 111-005A <br /> (SBCDA TIF) <br /> Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted a Corrected Change Order No. <br /> 1 on behalf of Ziolkowski Construction, 4050 Ralph Jones Drive, South Bend, Indiana 46628, <br /> indicating the Contract amount be increased by $82,556.00 for a modified Contract sure, <br /> including this Change Order, in the amount of $1,110,556.00. Mr. Villa stated that on his <br /> previously submitted Change Order No. 1, the change was based upon the wrong starting <br /> contract amount. Upon a motion made by Mr. Inks, seconded by Mr. Littrell and carried, the <br /> corrected Change Order was approved. <br /> APPROVE CORRECTED CHANGE ORDER NO. 2 — COVELESKI STADIUM <br /> IMPROVEMENTS — MAIN FACILITY REHABILITATION — PROJECT NO. 111-005A <br /> S( BCDA TIF) <br /> Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted a Corrected Change Order No. <br /> 2 on behalf of Ziolkowski Construction, 4050 Ralph Jones Drive, South Bend, Indiana 46628, <br /> indicating the Contract amount be increased by $73,207.00 for a modified Contract sum, <br /> including this Change Order, in the amount of $1,183,763.00. Mr. Villa stated that on his <br />