My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (5)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
06-28-11 Packet
>
6C (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2011 10:17:53 AM
Creation date
6/24/2011 12:07:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
May 4, 2011 - <br />City of South Bend . <br />Proposal for Professional Services <br />LaSalle Square, Phase One - Roadway and Utility Design ASONMARCNE <br />Bonds Avenue Extension and New City Street Adjacent to Library Page 1 of 5 <br />APPENDIX A <br />WORK PLAN <br />PROJECT SCOPE <br />The proposed project consists of the design and development of bid documents for the <br />construction of Bonds Avenue ( ±470 feet) and a new City Street ( ±340 feet) adjacent to the <br />St. Joseph County Public Library. Bonds shall be extended from Bendix Avenue to intersect <br />with the new City Street. The existing private drive adjacent to the library shall be <br />completely removed and reconstructed. Both streets shall be designed and constructed to <br />City Standards with a pavement width of 24 feet, combined concrete curb and gutter on <br />each side, sidewalk five feet wide on each side of Bonds, and a grass parkway. There will <br />be no proposed sidewalks on the new City Street. It is anticipated that Bonds will contain an <br />entrance for the proposed senior housing and an entrance for Faith Apostolic Church. <br />A new utility route for the existing sanitary sewer and water main shall be designed in the <br />new City Right -of -Way adjacent to the library to make way for the proposed senior housing <br />project. This utility work will be included with the roadway construction bid documents. <br />Separate construction bid documents shall be prepared for demolition of the restaurant <br />property located on the northwest corner of Bendix and Bonds. This project shall be bid prior <br />to the roadway construction project. <br />Traffic signal work is not anticipated at Bendix, although, pedestrian safety shall be <br />evaluated for walkers between the proposed senior housing project and Memorial's Facility <br />located on the east side of Bendix. <br />SCOPE OF SERVICES <br />The scope of services proposed herein includes the design and development of bid <br />documents for the demolition and roadway projects, and are further described as follows: <br />Task #1: Field Survey <br />This task includes performing a field survey of existing conditions and utilities for use in <br />designing the roadway and utility relocation design, demolition of the restaurant property, <br />and designing a temporary drainage basin anticipated to be located on the St. Vincent De <br />Paul's property. A benchmark level circuit shall be performed through the proposed project <br />corridor and control points shall be established for construction. This task also includes <br />researching existing utilities. <br />Task #2: Phase One Environmental Site Assessment (ESA) <br />This task involves performing a Phase One ESA of the Restaurant Property in accordance <br />with ASTM E1527 -05 (adopted in 2006) and generally accepted industry standards <br />concerning environmental site assessments. A written report shall be prepared that lists any <br />recognized environmental conditions identified, consolidate and discuss information <br />Engineers Landscape Architects Planners Surveyors <br />
The URL can be used to link to this page
Your browser does not support the video tag.