My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/23/07 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2007
>
04/23/07 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2007 3:54:44 PM
Creation date
9/20/2007 3:51:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/23/2007
Document Relationships
04/23/07 Board of Public Works Regular Meeting Agenda
(Superseded by)
Path:
\Public\Public Works\Agendas\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,. REGULAR MEETING <br />.a. N <br />APRIL 23, 2007 <br /> <br /> Concrete Sidewalk <br />Removal & <br />Re lacement <br />2A Full Block (5 or More <br />Pro erties) 1 LFT $28.00 $28.00 <br />2B Full Lot 2700 LFT $35.00 $94,500.00 <br /> <br /> Combination -Curb <br />and Sidewalk removal <br />& Re lacement <br />3A Full Block (5 or More <br />Pro erties 1 LFT $90.00 $90.00 <br />3B Full Lot 400 LFT $107.00 $42,800.00 <br /> <br />4 Alley A roach 50 SYS $77.00 $3,850.00 <br />5 Handica Ram 50 SYS $120.00 $6,000.00 <br /> <br /> Total Cost $169,306.00 <br />RIETH-RILEY CONSTRUCTION CO.. INC. <br />2520 State Road 23 <br />South Bend, Indiana 46614 <br />Bid was signed by: Mr. Todd Kulczar <br />Non-Collusion Affidavit was in order <br />Non-Discrimination commitment form was completed <br />Ten percent (10%) Bid Bond was submitted <br />BID: <br />ZONE l <br /> Item Quantity Unit Unit Price Amount <br />No. Dols. Cent Dols. Cent <br /> Concrete Curb <br />Removal & <br />Re lacement <br />1 A Full Block (5 or More <br />Pro erties) 1 LFT $42.00 $42.00 <br />1B Full Lot 850 LFT $42.00 $35,700.00 <br /> <br /> Concrete Sidewalk <br />Removal & <br />Re lacement <br />2A Full Block (5 or More <br />Pro erties) 1 LFT $38.00 $38.00 <br />2B Full Lot 2200 LFT $38.00 $83,600.00 <br /> <br /> Combination -Curb <br />and Sidewalk removal <br />& Re lacement <br />3A Full Block (5 or More <br />Pro erties) 1 LFT $85.00 $85.00 <br />3B Full Lot 650 LFT $85.00 $55,250.00 <br /> <br />4 Alle A roach 50 SYS $60.00 $3,000.00 <br />5 Handica Ram 50 SYS $100.00 $5,000.00 <br /> <br /> Total Cost $182,715.00 <br />1 <br />1 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.