Laserfiche WebLink
Construction Cost Estimate - City of South Bend <br />Project No. <br />Cost Estimate <br />CITY OF SOUTH BEND <br />May 2011 <br />PROJECT NAME 621 East Jefferson Boulevard Streetscape <br />PROJECT NUMBER <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />2.0% <br />$600.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />5.0% <br />$1,500.00 <br />3. <br />Material Testing <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />4. <br />Concrete Curb, Remove <br />103 <br />LFT <br />$5.00 <br />$515.00 <br />5. <br />Concrete Pavement, Remove <br />195 <br />SYS <br />$15.00 <br />$2,925.00 <br />6. <br />Common Excavation <br />22 <br />CYS <br />$12.00 <br />$264.00 <br />7. <br />"B" Borrow <br />50 <br />CYS <br />$9.00 <br />$450.00 <br />8. <br />"B" Borrow for Structure Backfill <br />50 <br />CYS <br />$11.00 <br />$550.00 <br />9. <br />Compacted Aggregate, No. 53, Base <br />14 <br />TON <br />$18.00 <br />$252.00 <br />10. <br />Coarse Aggregate, No. 8 <br />22 <br />CYS <br />$35.00 <br />$770.00 <br />11. <br />Sidewalk, Concrete, 4" <br />118 <br />SYS <br />$45.00 <br />$5,310.00 <br />12. <br />Sidewalk, Pervious Concrete, 4" <br />36 <br />SYS <br />$120.00 <br />$4,320.00 <br />13. <br />Concrete Curb, 6" <br />76 <br />LFT <br />$18.00 <br />$1,368.00 <br />14. <br />Concrete Step <br />1 <br />EA <br />$100.00 <br />$100.00 <br />15. <br />PCCP for Approaches, 6" <br />41 <br />SYS <br />$45.00 <br />$1,845.00 <br />16. <br />Tree <br />1 <br />EA <br />$400.00 <br />$400.00 <br />17. <br />Valve, Adjust to Grade <br />2 <br />EA <br />$350.00 <br />$700.00 <br />18. <br />Maintaining Traffic <br />1 <br />LS <br />$5,000.00 <br />$5,000.00 <br />19. <br />PVC Schedule 80, 2 ", and Nylon Pull Rope <br />115 <br />LFT <br />$10.00 <br />$1,150.00 <br />20. <br />Light Pole Foundation <br />1 <br />EA <br />$2,500.00 <br />$2,500.00 <br />21. <br />Temporary Bollard <br />1 <br />EA <br />$400.00 1 <br />$400.00 <br />Total <br />Temporary Bollard to be placed on light pole foundation in lieu of light fixture until balance of project is completed <br />F:%ProJoMW947480d Dom meet %Quote DouxnerftjOuote Farm 2011 04- 20AS)Coat Estimate <br />$33,400.00 <br />