Laserfiche WebLink
surgical wastes potentially contaminated laboratory wastes, and dialysis wastes. <br />xx Monthly AveM e means the sum of the concentrations of all "dail <br />discharges' measured during a calendar month divided by the number of "daily <br />discharges" measured during that month. <br />(w) Monthly Average Limit means the highest allowable average_ of "dailx <br />discharges" over a calendar month, calculated as the sum of the concentrations of <br />zz National Categorical Pretreatment Standard means any regulation <br />containing pollutant discharge limits promulgated by the EPA in accordance with <br />Section 307(b) and (c) of the Federal Water Pollution Control Act, also known as <br />the Clean Water Act (33 U.S.C. 1317) which applies to a specific category of <br />industrial users and which appear in 40 CFR, Chapter 1, Subchapter N, Parts 405- <br />471. <br />aaa Natural Outlet means any outlet, including storm sewers and combined <br />sewer overflows, into a watercourse, pond, ditch, lake or other body of surface or <br />ground water. <br />b( bb) New source means: <br />(a)L1.) Any building, structure, facility, or installation from which there is <br />(or may be) a discharge of pollutants, the construction of which <br />commenced after the publication of proposed pretreatment standards under <br />Section 307(c) of the Act which will be applicable to such source if such <br />standards are thereafter promulgated in accordance with that section, <br />provided that: <br />(4)La) The building, structure, facility or installation is constructed <br />at a site at which no other source is located; or <br />(2)fb) The building, structure, facility, or installation totally <br />replaces the process or production equipment that causes the <br />discharge of pollutants at any existing source; or <br />(4)Lq) The production or wastewater generating processes of the <br />building, structure, facility, or installation are substantially <br />independent of an existing source at the same site. In determining <br />whether these are substantially independent, factors such as the <br />extent to which the new facility is integrated with the existing <br />plant, and the extent to which the new facility is engaged in the <br />same general type of activity as the existing source, should be <br />0 <br />