Laserfiche WebLink
Access to individual parcels may be provided by the development of <br />internal public streets, internal private streets or by limited private <br />access easements serving multiple uses within Ignition Park. <br />Full -width street road cuts shall not exceed thirty -six (36) feet in <br />width. Median divided street road cuts shall be of a width as <br />approved by the City Engineer. All street road cuts shall be a <br />minimum of two- hundred and fifty (250) feet apart. All street road <br />cuts shall be a minimum of three hundred (300) feet from the <br />intersection of two (2) streets. The location and number of access <br />points shall be subject to the approval of the City Engineer. <br />(2) Ignition Park Minimum Yard and Minimum Building Setback <br />Requirements, refer to Diagram 2: Area 1 Setbacks. <br />a. Front Yard and Building Setback — The minimum front yard <br />and minimum building setback, measured from the front lot <br />line abutting a perimeter street shall be as follows: <br />G <br />MINIMUM YARD AND BUILDING SETBACK REQUIREMENTS: <br />SAM PLEJPRAIRIE /COTTER/KENDALL/WAYE TF <br />4 <br />BDDB01 6339098v1 Draft Date: September 21, 2010 <br />i. Sample / Prairie / Cotter / Kendall / Lafayette <br />— 20'. <br />PERIMETER STREET <br />-- - - - - - - -- <br />T--- RITiMT- OF- YIIAY <br />i I <br />I <br />20• -0• <br />I MIN. <br />20• -0• <br />20' -0• <br />( <br />MIN. I I <br />MIN. <br />I <br />j 3 <br />tz <br />I <br />LU <br />X17 0l <br />a <br />NI <br />I I <br />L - -SIDE OR REAR - - - -- --- -- -•- --- <br />LOT LINE 20•-0• <br />MIN. <br />G <br />MINIMUM YARD AND BUILDING SETBACK REQUIREMENTS: <br />SAM PLEJPRAIRIE /COTTER/KENDALL/WAYE TF <br />4 <br />BDDB01 6339098v1 Draft Date: September 21, 2010 <br />