My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2771 approving/authorizing the execution of an addendum to the Master Agency Agreement (Olive Road Extension Design Project - Brick to Adams)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2771 approving/authorizing the execution of an addendum to the Master Agency Agreement (Olive Road Extension Design Project - Brick to Adams)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:47:30 PM
Creation date
6/6/2011 2:54:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
14 <br />APPENDIX "A" <br />BASIC SERVICES BY ENGINEER <br />A. The ENGINEER will provide the field survey required for preparation of design <br />plans for the Project in conformance with the requirements of the Indiana <br />Department of Transportation Design Manual, Part Ill, Location Surveys, a copy <br />of which is on file with the ENGINEER and same is incorporated herein by <br />reference and is made a part hereof. <br />Necessary field survey will include: <br />a. Complete topographic data along Olive Road extended north from <br />Brick Road to Adams Road, approximately 5,600 feet in length. <br />Width of the topographic survey varies as shown in Exhibit A. <br />Complete topographic data along Brick Road and Adams Road <br />extended 300 feet either side of Olive Road. Width of the <br />topographic survey is 100 feet both sides of the existing centerline. <br />b. Establish and reference alignments along each surveyed line. Set <br />and Reference control points at 500 foot intervals. Set Vertical <br />Bench Marks at both ends of the project limits and at 500 foot <br />intervals. <br />C. Locate surface evidence of buried utilities and utility lines, if marked <br />by others. Indiana Plant Protection to be contacted for locate. <br />Locate manholes, inlets and provide pipe sizes and invert <br />elevations, for any sewer entering or crossing the proposed survey <br />limits. Locate drainage structures under roadways and driveways, <br />including types and inverts. <br />d. Property lines and right of ways will be placed on topography using <br />existing property irons, and other evidence found together with <br />subdivision plats and last deed of record, if available. Right of way <br />is expected to be acquired for this project. A Location Control <br />Route Survey Plat will be prepared for each Phase. <br />B. The Project, as described herein, shall consist of the following: <br />1. Design of Olive Road, for Alignment Planning (30% Design), extended <br />north from Brick Road to Adams Road, approximately 5,600 feet in length <br />(see Exhibit A). The design shall include a four -lane roadway with <br />median and mutil -use trail along the east side. The design speed of Olive <br />Road will be 40 mph. <br />2. Prepare Concept/Master plan for Linear drainage utilizing low impact <br />design along the Olive Road Corridor. <br />3. Prepare a 30% conceptual design of the reconfigured intersection of Olive <br />Road and Adams Road. <br />4. Prepare a 30% conceptual design of the reconfigured intersection of Olive <br />Road and Brick Road. <br />1 of 4 <br />Appendix "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.