My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2749 approving/authorizing the execution of an addendum to the Master Agency Agreement (Main-Lafayette Connector Design Project)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2749 approving/authorizing the execution of an addendum to the Master Agency Agreement (Main-Lafayette Connector Design Project)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:49:49 PM
Creation date
6/6/2011 1:40:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L FA�1'�► ATTACHMENT "C" <br />CRY OF SOUTH BEND, INDIANA <br />SOUTH MAIN ST TO LAFAYETTE CONNECTOR AND ROUNDABOUT <br />STAFF HOUR JUSTIFICATION - PROJECT DESIGN DEVELOPMENT <br />Work Element <br />,- <br />No. <br />STAFF HOURS BY CLASSIFICATION <br />Total <br />SUBCONSULTANT <br />Shts. <br />Proj. Mann et <br />Senior Eng <br />Civil Eng. <br />Senior Tech. <br />Clerical <br />Hours <br />COST <br />PRELIMINARY DESIGN <br />'erveyand Preimina ry Platting <br />Field Sury ey <br />4 <br />6 <br />320 <br />330 <br />Loation Route Control Survey and Plat #1 (By DLZ) <br />S38Spp <br />Review Sury ey Field Data <br />8 <br />8 <br />Coordination and Control of R!W Sub - Consultant <br />1 <br />2 <br />2 <br />2 <br />7 <br />Preliminary Plan Submittal <br />Designer Field Inspection <br />4 <br />4 <br />8 <br />Establish Grade Controls, Prepare Overall Grade Profile <br />4 <br />16 <br />12 <br />32 <br />Design Pr Geometries Prepare Overall Plan <br />2 <br />8 <br />24 <br />12 <br />46 <br />Utility Coordination <br />1 <br />8 <br />4 <br />4 <br />17 <br />Pmpare Prelnnmary Title & index Sheets <br />1 <br />4 <br />5 <br />Pmpare Prclintinary Typical Cross Sections <br />1 <br />2 <br />8 <br />8 <br />19 <br />Prepare Preffinmary Platy & Profile Sheets <br />2 <br />8 <br />16 <br />24 <br />50 <br />Roundabout layout and grading Plans <br />4 <br />16 <br />24 <br />4 <br />48 <br />Prelimmaty Right-of-Way <br />2 <br />4 <br />8 <br />14 <br />Prelintinary Drainage Design <br />2 <br />12 <br />4 <br />18 <br />Prelunmary Sanitary Sewer Design <br />1 <br />10 <br />4 <br />15 <br />Prelluntnary Water Lime Design <br />2 <br />12 <br />4 <br />18 <br />Prepare Preliminary Approach & Drive Octal <br />2 <br />16 <br />18 <br />I'mpare Prelitnmaty Structure Data <br />4 <br />12 <br />16 <br />Prepare Preliminary Cross Sections <br />4 <br />24 <br />24 <br />52 <br />Prepare Con ceptual Maintenance Of Traffic <br />2 <br />8 <br />10 <br />Prelnninary Consiruction Cost Estimate <br />1 <br />2 <br />4 <br />1 <br />8 <br />Emvironmental Screening Report - HazMat (by ASC Group) <br />$9,127 <br />Environmental Screening Repoft - IHst. Arch (by ASC Group) <br />$6,330 <br />Coordination and Control of Environmental Sub-Consultant <br />1 <br />2 <br />2 <br />2 <br />7 <br />SUBTOTAL HOURS <br />0 <br />17 <br />76 <br />180 <br />464 <br />9 <br />746 <br />$53,957 <br />RIGHT -OF -WAY DESIGN <br />ition of Prelintinary Plan Review Comments <br />1 <br />2 <br />4 <br />7 <br />_ heck as <br />Sheet and Index Sheet <br />1 <br />4 <br />5 <br />an & Profile Sheets <br />1 <br />2 <br />6 <br />24 <br />24 <br />56 <br />S Signs <br />10 <br />12 <br />22 <br />Sign Structures <br />12 <br />20 <br />32 <br />signals <br />12 <br />6 <br />18 <br />Intersection Details <br />1 <br />2 <br />4 <br />12 <br />19 <br />Roundabout Details <br />2 <br />24 <br />12 <br />24 <br />62 <br />Retaining Wags <br />2 <br />4 <br />6 <br />Special Drainage Structures <br />1 <br />2 <br />4 <br />7 <br />Sanitary Sewer Details <br />2 <br />8 <br />16 <br />26 <br />Waterline Details <br />2 <br />6 <br />12 <br />20 <br />Maintenance of Traffic <br />2 <br />4 <br />8 <br />16 <br />30 <br />Cross Sections <br />2 <br />8 <br />28 <br />42 <br />80 <br />Construction Cost Estimate <br />1 <br />2 <br />4 <br />1 <br />8 <br />Geotechnial Investiprtion (by Earth Explorations, Inc) <br />$7,167 <br />Coordination and Control of Geotechnical Sub - Consultant <br />1 <br />2 <br />6 <br />9 <br />Pavement Design <br />1 <br />4 <br />2 <br />7 <br />Utility Coordination <br />1 <br />8 <br />2 <br />2 <br />13 <br />Hydraulics and Storm Sewer Calculations <br />2 <br />6 <br />36 <br />2 <br />46 <br />Pmlbninary Construction Cost Estimate <br />1 <br />2 <br />8 <br />1 <br />12 <br />Field Check and Documentation <br />4 <br />4 <br />2 <br />10 <br />Disposition of Field Check Review Comments <br />1 <br />2 <br />4 <br />8 <br />15 <br />Public Information Meeting Preparation <br />Tragic- Maintenance Plan <br />1 <br />2 <br />4 <br />7 <br />Displays <br />1 <br />4 <br />12 <br />4 <br />21 <br />Public Meeting <br />3 <br />3 <br />3 <br />9 <br />Disposition of Pubic Meeting Comments <br />1 <br />2 <br />4 <br />2 <br />9 <br />Legal Descriptions and Transfer Documents (by DLZ Indiana, LLC) <br />$94,120 <br />Coordination and Control of R/W Sub - Consultant <br />1 <br />2 <br />2 <br />2 <br />7 <br />SUBTOTAL HOURS <br />0 <br />26 <br />78 <br />213 <br />228 <br />is <br />563 <br />5101,287 <br />Lawson- Fisher Associates P.C. <br />Project File No. 9018.95 <br />Augiat 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.