My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2732 approving/authorizing the execution of an addendum to the Master Agency Agreement (Wayne St. Parking Garage Repair Assessment)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2732 approving/authorizing the execution of an addendum to the Master Agency Agreement (Wayne St. Parking Garage Repair Assessment)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:51:31 PM
Creation date
6/2/2011 2:32:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />• <br />Condition Assessment & Preventive Maintenance Program <br />St. Joseph/Wayne Street Parking Garage <br />City of South Bend <br />June 29, 2010 <br />Page 3 <br />Task I -6 Schedule a meeting with the City to discuss the Fagade Investigation Report and permanent <br />repairs to the facade. <br />FEE PROPOSAL <br />For the St. Joseph/Wayne Street Parking Garage, FUJAWA will perform the SCOPE OF SERVICES <br />outlined above for the following fee schedule: <br />PHASE I - Structural Condition Survey/Repair Options Analysis/Report <br />➢ Lump Sum Professional Services Fee (Tasks I -1, 2,3 & 6) ..................... .....................$21,000.00 <br />➢ Man at ground level during inspection (Task I -4) ....................... ............................... WPM hour <br />➢ Allowance to Remove Loose Brick & Cement Overlay (Task 1-5). ....Contact Contractor for Price <br />The proposed professional fee for PHASE I Tasks 1 -1, 2, 3 & 6 is presented as a lump sum amount and <br />will be billed upon completion. The fee for Phase 1 Task 1 -4 is presented as an hourly amount and will be <br />apon completion. The fee for Phase I Task I -S should be arranged with the contractor. <br />EXCLUSIONS TO THE SCOPE OF SERVICES <br />Services excluded from the SCOPE OF SERVICES as outlined above are as follows: <br />• Observation, assessment, reporting and any responsibility regarding the discovery, presence, <br />handling, removal and disposal of, or exposure of persons to, hazardous materials in any form at the <br />project site, including but not limited to, asbestos, asbestos products, lead, polychlorinated biphenyl <br />(PCB) or other toxic substance. <br />• Services for subsequent tasks related to repair drawings and execution of the work. If applicable, <br />FUJAWA may provide a proposal for those services and project deliverables at a later date, based on <br />a selected and authorized repair program and phasing requirements by the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.