My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2732 approving/authorizing the execution of an addendum to the Master Agency Agreement (Wayne St. Parking Garage Repair Assessment)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2732 approving/authorizing the execution of an addendum to the Master Agency Agreement (Wayne St. Parking Garage Repair Assessment)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:51:31 PM
Creation date
6/2/2011 2:32:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAUL <br />FUJAWA <br />ENGINEERS, <br />INC. <br />Tuesday, June 29, 2010 <br />Mr. Carl P. Littrell, P.E. <br />City Engineer <br />The City of South Bend <br />Department of Public Works, <br />Division of Engineering <br />1316 County -City Building <br />South Bend, Indiana 46601 <br />RE: Proposal for Professional Engineering Services <br />Investigation of FaVade Condition <br />St. Joseph/Wayne Street Parking Garage <br />0 South Bend, Indiana <br />Dear Mr. Littrell: <br />In response to your recent request, Paul Fujawa Engineers, Inc. (FUJAWA) is pleased to submit the <br />following proposal to perform a investigation of the fagade condition for the referenced City -owned parking <br />structure. <br />The St. Joseph/Wayne Street Parking Garage has pre -cast concrete panels with thin -set brick mounted on <br />all four sides of the garage. The garage was constructed in around 1989. During the fall of 2009, Casteel <br />Construction removed and repaired portions of the brick that had delaminated on the west face. During a <br />recent site visit, an area of brick that had fallen off the building was noted on the south face. Also, <br />structural concrete elements of the garage are covered with a cement overlay and painted on the exterior <br />faces. During the site visit, I observed that areas of these overlays are also cracking and delaminating. <br />SCOPE OF SERVICES <br />FUJAWA proposes the following program of services, which are essential to properly evaluate the <br />parking garage for the purpose of developing a prioritized list of cost - effective repair /preventive <br />maintenance program options: <br />PHASE I —Investigation of FaVade Condition <br />40 Task I -1 Review available existing documents, i.e., drawings, specifications, concrete test reports, <br />former condition survey reports, etc., in order to acquaint ourselves with the parking garage, <br />prior to conducting an on -site survey of the facility. FUJAWA has the existing structural <br />17455 Douglas Road / South Bend, IN 46635 / (574) 273 -5014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.