Laserfiche WebLink
t <br />�I <br />t <br />F,XHM'F T R <br />DLZ INDIANA, LLC <br />STANDARD FEE STRUCTURE <br />ENGINEERING /ARCHITECTURAL <br />2010 <br />1 <br />Principal <br />$220.00 <br />49 <br />Division Manager (Chief Engineer) <br />$175.00 <br />50 <br />-Department Manager <br />$160.00 <br />55 <br />Registered Land Surveyor <br />$130.00 <br />21 <br />Project Manager <br />$135.00 <br />214 <br />Senior Right-of-Way Engineer <br />$135.00 <br />53/58 <br />Engineer III/Architect III/Landscape Architect IIU <br />Planner III/Scientist III/Geologist III <br />$122.50 <br />52/57 <br />Engineer II/Architect II/Landscape Architect IF <br />Planner II/Desi er III/Scientist II/Geologist II <br />$112.50 <br />51/56 <br />Engineer I/Architect I/Landscape Architect U <br />Planner I/ Designer II/Scientist I/Geolo 'st I <br />$90.00 <br />28 <br />Designer I <br />$75.00 <br />29 <br />Technician <br />$65.00 <br />147 <br />Construction Administrator <br />$105.00 <br />152 <br />Construction Observer <br />$85.00 <br />43 <br />Clerical <br />$50.00 <br />Rates are subject to revision on January 1, 2011. <br />Cost of living/inflation increases of 3 to 7% per annum can be anticipated. <br />S:\ Dept\Administrative \Clerical\RATES\2009REV Howly Rates.doc <br />F <br />2: �.l- i y �., _�,. 4- °i - ..v. �.�, . � q.. .� 3b xnl? v{� <br />2`y� 'i �" ,C �• �-* i+ � Y i Sk d`+yy' ix 1...3 <br />Mileage (Outside of St. Joseph County) <br />$0.445 /mile <br />Travel Expenses <br />Cost <br />Living Expenses <br />Cost <br />Reproduction <br />Refer to Paragraph A.4.b of Appendix D <br />Subconsultants <br />Refer to Para a h A.4.b of Appendix D <br />Equipment Rental <br />Refer to Para a h A.4.b of A endix D <br />Rates are subject to revision on January 1, 2011. <br />Cost of living/inflation increases of 3 to 7% per annum can be anticipated. <br />S:\ Dept\Administrative \Clerical\RATES\2009REV Howly Rates.doc <br />