My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2687 approving/authorizing the execution of an addendum to the Master Agency Agreement (Trade Drive Project)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2687 approving/authorizing the execution of an addendum to the Master Agency Agreement (Trade Drive Project)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:55:18 PM
Creation date
5/31/2011 3:43:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 3. Payment for any item not otherwise set out herein shall be <br />made based upon percentage of completion. <br />• <br />3. The OWNER, for and in consideration of the rendering of the engineering <br />services provided for in Appendix "A ", agrees to pay the ENGINEER for <br />rendering such services the fee established above upon completion of the <br />work thereunder and acceptance thereof by the OWNER. <br />4. The OWNER, for and in consideration of the rendering of the additional <br />services provided in Appendix "E ", agrees to pay the ENGINEER for <br />rendering such services the payments established above upon completion <br />of the work thereunder and acceptance thereof by the OWNER. <br />5. If design changes are required during construction due to design errors in <br />the final plans or specifications, the ENGINEER will make such necessary <br />design changes without additional cost to the OWNER. However, if <br />design changes are required during construction which are occasioned by <br />changed conditions or conditions which could not have been reasonably <br />foreseen by the ENGINEER prior to construction, the ENGINEER will be <br />paid for such modifications on the basis of actual hours of work performed <br />by`essential personnel exclUMV61y "orl'this contract at the employee hourly <br />rate in accordance with the ENGINEER's fee structure attached as <br />Exhibit B to this Agreement. <br />6. In the event of a substantial change in scope, character or complexity of <br />the work on the project, the maximum fee payable and the specified fee <br />shall be adjusted in accordance with Section VI, Paragraph 11 of this <br />Agreement. <br />(The remainder of this page intentionally left blank) <br />4 of 4 <br />Appendix "D" <br />
The URL can be used to link to this page
Your browser does not support the video tag.