Laserfiche WebLink
APPENDIX "C" <br />SCHEDULE <br />All work by the ENGINEER under this Agreement shall be completed and <br />delivered to the OWNER as follows, exclusive of OWNER's review. <br />A. Roadway Design and Plans <br />1. Field Survey completed within 30 calendar days after receipt of the Notice <br />to Proceed. <br />2. Preliminary Field Check Plans within 90 calendar days after completion of <br />the Survey. <br />3. Final Plans (including Special Provisions) within 60 calendar days after <br />approval of the Preliminary Field Check Plans by the OWNER. <br />4. Final Tracings and Final Contract Documents within 30 calendar days <br />after receipt from the OWNER of approval of Final Plans. <br />B. The plans will be ready for letting in approximately February 2011, based on a <br />notice to proceed by May 4, 2010, contingent upon right -of -way acquisition <br />(based on 1 RIK parce.1- WHl..be donated and obtained by City) and up to 1.5_dayn: --.— <br />OWNER review periods. <br />• (The remainder of this page intentionally left blank) <br />1 of 1 <br />Appendix "C" <br />