Laserfiche WebLink
• <br />t <br />E <br />• Roadside Design Guide, American Association of State Highway <br />and Transportation Officials. <br />• Standard Specifications, Indiana Department of Transportation. <br />• Indiana Manual on Uniform Tragic Control Devices for Streets and <br />Highways, (IMUTCD). <br />Where conflict exists between the Standards and Specifications of City of <br />South Bend and those of the Indiana Department of Transportation, the <br />Standards and. Specifications of City of South Bend shall prevail. <br />5. The ENGINEER shall prepare a recommended pavement design in <br />accordance with current City of South Bend and /or AASHTO standards. <br />6. The ENGINEER shall prepare (1) one set of Preliminary Field Check <br />Plans and a preliminary statement of probable construction cost for the <br />OWNER'S review and comment. <br />7. When authorized by the OWNER, the ENGINEER shall: <br />a. Order title insurance for each parcel from which there will be a <br />taking. <br />b. Prepare a plat and description for each parcel of right of way to be <br />acquired, both permanent and temporary. <br />c. =W-hen- directed, the ENGINEER will stake the existing right of-way <br />lines to assist the property owner to visualize the amount of <br />proposed property to be acquired. Points will be marked by stake. <br />Tacking accuracy is not required. <br />d. Any modifications to the appraisal price or changes in the plans <br />recommended during negotiations must be approved by the <br />OWNER and are Additional Services. <br />8. Upon receipt of approval of the Preliminary Field Check Plans, the <br />ENGINEER shall prepare Final Plans and a revised Statement of <br />Probable Construction Cost. <br />The Final Plans shall include all construction details, show all impacts <br />including access provisions to adjacent properties, show rights of way <br />required for construction of the project and include any maintenance of <br />traffic provisions necessary for the roads at all ends of the project. <br />The statement of probable construction cost for construction and shall <br />include all items of work required for the complete construction of the <br />work, including all temporary work necessary in connection therewith, but <br />shall not include the cost of such items of work for which the OWNER, <br />through its own forces or through other party or parties will prepare detail <br />plans. <br />9. Geotechnical Services <br />a. The ENGINEER shall make or cause to be made, geotechnical <br />investigations. <br />3 of 6 <br />Appendix "A" <br />