My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2672 approving/authorizing the execution of an addendum to the Master Agency Agreement (Michigan Street S-Curve Removal)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2672 approving/authorizing the execution of an addendum to the Master Agency Agreement (Michigan Street S-Curve Removal)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:58:04 PM
Creation date
5/24/2011 2:02:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit 1 <br />Rates are subject to revision on January 1, 2011. <br />rnet of livinalinfintinn inrrA %cPa nf'l M 'ia/ nor annum non ha a..+in: —+ea <br />DLZ INDIANA, LLC <br />STANDARD FEE STRUCTURE <br />ENGINEERING /ARCHITECTURAL <br />2010 <br />- A - <br />143/99/99 <br />1 <br />Principal <br />$220.00 <br />Topographic Survey Crew (straight time) <br />49 <br />Division Manager (Chief Engineer) <br />$175.00 <br />$220.00 <br />50 <br />Department Manager <br />$160.00 <br />63 <br />55 <br />Registered Land Surveyor <br />$130.00 <br />1— person GPS/RTK Field Crew <br />21 <br />Pro'ect Manager <br />$135.00 <br />$52.50 <br />214 <br />Senior Righ"f-Way Engineer <br />$135.00 <br />330 <br />Electrical Engineering Specialist <br />$150.00 <br />53/58 <br />Engineer III/Architect III/Landscape Architect 111/ <br />Planner III/Scientist III/Geologist III <br />$122.50 <br />52/57 <br />Engineer II/Architect II/Landscape Architect II/ <br />Planner II/Designer III/Scientist II/Geologist II <br />$112.50 <br />51/56 <br />Engineer I/Architect I/Landscape Architect U <br />Planner I/ Desi er II/Scientist I/Geolo 'st 1 <br />$90.00 <br />28 <br />Designer 1 <br />$75.00 <br />29 <br />Technician <br />$65.00 <br />147 <br />Construction Administrator <br />$105.00 <br />152 <br />Construction Observer <br />$85.00 <br />43 <br />1 Clerical <br />$50.00 <br />Rates are subject to revision on January 1, 2011. <br />rnet of livinalinfintinn inrrA %cPa nf'l M 'ia/ nor annum non ha a..+in: —+ea <br />143/99/99 <br />3 — person Surve Crew <br />$182.50 <br />142/99 <br />Topographic Survey Crew (straight time) <br />$145.00 <br />142/99 <br />Topographic Survey Crew over time) <br />$220.00 <br />63 <br />1 — person Field Crew <br />$100.00 <br />63 <br />1— person Field Crew (over time ) <br />$1400.00 <br />GPS <br />1— person GPS/RTK Field Crew <br />$160.00 <br />13 <br />Field Survey Technician <br />$52.50 <br />Rates are subject to revision on January 1, 2011. <br />rnet of livinalinfintinn inrrA %cPa nf'l M 'ia/ nor annum non ha a..+in: —+ea <br />
The URL can be used to link to this page
Your browser does not support the video tag.