My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2671 approving/authorizing the execution of an addendum to the Master Agency Agreement (Bartlett Street Parking Structure Facade Upgrades)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2671 approving/authorizing the execution of an addendum to the Master Agency Agreement (Bartlett Street Parking Structure Facade Upgrades)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:58:27 PM
Creation date
5/24/2011 2:01:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Carl Littrell, PE <br />SB Memorial Hospital <br />March 30, 2010 <br />0 CARL WALKER, INC. FEE <br />We propose to provide our services on a lump sum fee plus customary reimbursable expense basis. <br />Reimbursable expenses include travel, communication, postage, and reproduction. <br />The following table summarizes our proposed fees and anticipated expenses: <br />Carl Walker, Inc. Professional Fees <br />Phase <br />Description <br />Fees <br />Estimated <br />Expenses <br />4 <br />Design Update <br />$12,500 <br />$200 <br />• Code Consultant Allowance (RTM) <br />$1,000 <br />5 <br />Bidding <br />$4,500 <br />$400 <br />6 <br />Construction Administration <br />$19,500 <br />$1,500 <br />TOTAL <br />$37,500 <br />$2,100 <br />Our proposed reimbursable expenses anticipate that final drawing reproduction and distribution costs <br />will be by the City. Our fee does not include the preparation of a rendered perspective. <br />Our proposed fee is based on up to three (3) meetings during the design phases, and a total of fourteen <br />(14) site visits during bidding and construction. This proposed fee does not include costs- for materials <br />testing or geotechnical engineering. <br />We anticipate using the standard AIA Agreement between the City of South Bend and Carl Walker. If <br />the terms in this letter are acceptable, please sign in the space provided and forward one copy as our <br />authorization to proceed. We welcome the opportunity to work with you, and if you have any questions <br />or would like to discuss this proposal, please contact me. <br />Very truly yours, <br />CARL WALKER, INC. <br />A -AIX <br />1 <br />Michael C. Ortlieb, PE <br />Executive Vice President <br />CC: Larry J. Lies, Memorial Hospital of South Bend <br />Gary Cole & Mark Sampson, Carl Walker <br />Gary A. Gilot, P.E., City of South Bend (agilot @southbendin.gov) <br />ACCEPTED BY: <br />City of South Bend <br />SIGNATURE <br />TITLE <br />DATE <br />MAMktg- 2010 \N1 -10 -113 South Bend Memorial Bartlett Street Facade \SBMH Bartlett Facade Renovation Proposal 03- 30- 10.doc <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.