Laserfiche WebLink
To: Metronet Date: 5/9111 <br />Proposal No.: D07 -0511 <br />Ph# <br />Email: <br />Attn: Mary Jan <br />Subject: Schaffer Gear, 4701 Nimtz Prkwy. <br />Proposal <br />1. Backbone Conduit and Fiber: <br />a. Bore 2" HDPE (approx. 2,700') from existing HH on Nimtz/Moreau Ct. to Schaffer Gear. <br />b. Install (3,500) Corning 72 strand from Moreau Ct. <br />c. Install (6) new Handholes. <br />d. Tie conduit into exiting HH. <br />e. Test and label. <br />$47,900.00 (Forty Seven Thousand Nine Hundred Dollars) <br />2. Lateral Fiber: <br />a. Install new Corning 12 strand SM fiber (500') from Nimtz into Schaffer Gear. <br />b. Install new fiber patch panel. <br />c. Splice strands to Metronet backbone. <br />d. Test and label. <br />$3,650.00 (Three Thousand Six Hundred Fifty Dollars) <br />3. Lateral Conduit: <br />a. Install 2" HDPE (150) from Metronet HH on Nimtz to the building. <br />b. Rough -in counduit into building. <br />c. Tie conduit into Metronet Handhole. <br />Material: $700.00 <br />$3,750.00 (Three Thousand Seven Hundred Fifty Dollars) <br />All materials are guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from <br />the above specifications or involving extra costs will be executed only upon written orders and will become an extra charge over and above this proposal. All <br />agreements are contingent upon strikes, accidents, or delays beyond our control. The Owner will carry fire, tornado, and other necessary insurance. Our workers are <br />fully covered by Workmen's Compensation Insurance. <br />Sincerely, <br />Matt Wiseman, RCDD <br />Manager, Telecom <br />Martell Electric <br />ACCEPTANCE OF PROPOSAL <br />The above prices, specifications, and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will <br />be made as stated above. <br />Signature: Date: <br />