My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C(1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
05-24-11 Packet
>
6C(1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:30:05 PM
Creation date
5/23/2011 4:51:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Ann Kolata <br />May 17, 2011 <br />S131058.200.0002 <br />Page 2 <br />STANDARD OF CARE AND LIMITATIONS <br />Hull shall perform its services using that degree of care and skill ordinarily exercised under <br />similar conditions by reputable members of its profession practicing in the same or similar <br />locality at the time of service. No other warranty, expressed or implied, is made or intended by <br />our proposal or by our oral or written reports. The work will not attempt to evaluate past or <br />present compliance with federal, state, or .local environmental or land use laws or regulations. <br />Conclusions presented by Hull regarding the Site to be investigated shall be consistent with the <br />Scope of Work, level of effort specified, and investigative techniques employed. Reports, <br />opinions, letters and other documents will not evaluate the presence or absence of any <br />compound or parameter not specifically analyzed and reported. The presence of radiation, <br />radon, lead, electromagnetic fields, and indoor air pollution will not be investigated, unless <br />specifically stated in the scope of work. Hull makes no guarantees regarding the completeness <br />or accuracy of any information obtained from public or private files or information :provided by <br />subcontractors. <br />Again, thank you for the opportunity to prepare this proposal. Hull will begin providing project <br />services immediately upon the City's written authorization. All work will be conducted pursuant <br />to Hull Contract # CNTRCT.300.2259. Please call me at (513) 459 -9677 if you have any <br />questions. <br />Sincerely, <br />I/ <br />. <br />W. Lance Turley <br />Principal <br />Douglas G. Stuart, CHMM <br />Senior Project Manager <br />WLT /DGS /kf <br />cc: Hull File Copy <br />
The URL can be used to link to this page
Your browser does not support the video tag.