My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B(4)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
05-24-11 Packet
>
6B(4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 2:30:57 PM
Creation date
5/23/2011 4:51:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
May, 2011 <br />City of South Bend <br />621 East Jefferson Boulevard <br />Streetscape Modernization Page 1 of 3 <br />APPENDIX A <br />Work Plan <br />PROJECT SCOPE <br />The proposed project consists of the streetscape modernization from 621 East Jefferson <br />Boulevard. The improvements will include replacement of the existing approaches and <br />sidewalks, addition of a landscaping planter, and improved drainage by use of a <br />pervious concrete sidewalk. The project will be designed in accordance with the <br />planned streetscape modernization project which will include Jefferson Boulevard from <br />Niles Avenue to St. Peter Street. <br />SCOPE OF SERVICES <br />The scope of services proposed herein includes the design and development of quote <br />documents for the project and are further described as follows: <br />Task #1: Design: <br />a) Revise City of South Bend Title Sheet <br />b) Revise typical section sheets <br />c) Revise grading plan <br />d) Revise plan view sheet of improvements <br />e) Revise pervious concrete detail sheet <br />f) Revise maintenance of traffic plan <br />g) Revise landscape plan <br />h) Coordinate with utility companies <br />1) Calculate project quantities <br />j) Develop cost estimate <br />k) Submit three (3) sets of plans to the City for review <br />1) Meet with the City to review the plans <br />m) Revise plans according to the City review <br />Task #2: Quote Documents: <br />a) Prepare bid proposal sheets <br />b) Prepare special provisions <br />c) Prepare Quote Package <br />d) Submit three (3) sets quote documents to the City for review <br />e) Meet with the City to review the quote documents <br />f) Revise documents according to the City review <br />Engineers Architects Planners Surveyors <br />
The URL can be used to link to this page
Your browser does not support the video tag.