My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 2585 transferring property to the board of public works for the purpose of transferring the property to a non-profit entity
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 2585 transferring property to the board of public works for the purpose of transferring the property to a non-profit entity
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 1:10:42 PM
Creation date
5/18/2011 1:15:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t <br />EXHIBIT A <br />BPO - Bendix Physicians' Office <br />3- Jun -08 <br />Budget based on 4 -2 -08 schematic drawing set <br />General Conditions <br />30,000.00 <br />New Concrete Approaches / walks <br />8,500.00 <br />Drainage / retention / allowance <br />10,000.00 <br />Pavement (asphalt recoat) /wheelstops / lines <br />40,000.00 <br />Site grading / restoration / seeding <br />8,000.00 <br />Bldg demo / floor cutting / patching <br />12,000.00 <br />bldg excavation / concrete footing <br />7,000.00 <br />structure / framing / misc carpentry <br />20,000.00 <br />add insulation to attic <br />5,000.00 <br />new roof at meeting room / fascia & soffit - <br />13,000.00 <br />tear off and reroof balance of roof <br />15,000.00 <br />New doors / frames / hardware ext <br />5,000.00 <br />int <br />4,000.00 <br />Replace /repair ext'g windows - clad & trim / 3 solar <br />tubes <br />6,000.00 <br />system at mtg room & vestibule <br />15,000.00 <br />,Storefront <br />New cement fiber siding <br />30,000.00 <br />fir /plywd gable ends w/ battens <br />3,000.00 <br />exterior painting <br />. 3,000.00 <br />interior painting <br />20,000.00 <br />New GWB parititions / clg new mtg rm / rework <br />existing ceilings at lab, etc, <br />5,000:00 <br />Flooring - the at entry / carpet / rubber base (4000 <br />SF) <br />22,000.00 <br />specialties (toilet access, bars, etc) <br />2,000.00 <br />cabinetry & HPL tops <br />20,000.00 <br />Site signage (rework existing) <br />0.00 by Owner <br />Landscaping (add trees shrubs, etc) <br />5,000.00 <br />Subtotal: <br />308,500.00 <br />Contingency on subtotal: 5% <br />15,425.00 <br />HVAC / Plumbing / Electrical / site lighting 110,000.00 <br />Information technology 3,000.00 <br />Security 0.00 assume reuse existing <br />Consulants (mech, struct, landscape, etc) 15,000.00 quotes received <br />Preliminary construction budget: 451,925.00 <br />Program Delivery (SBHF project oversite) 10% 45,192.50 <br />*TOTAL Project: 497,117.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.