My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B(1)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
05-10-11 Packet
>
6B(1)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 4:19:28 PM
Creation date
5/11/2011 4:32:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT 'C" <br />? " SOUTH MAIN S7 TO LAFA ETTE CONNECTOR AND ROUNDABOUT <br />STAFF HOUR JUSTIFICATION • PROJECT DESIGN DEVELOPMENT <br />Laaron- fisher Associairs P.C. <br />Project Fite No. 901A. 9J <br />Atqusr 1010 <br />Work Detvent <br />No. <br />STAFF HOURS BY CLASSIl9CAT10N <br />701ai <br />SUBCO \SULTAN7 <br />Shts. <br />Pmj. Manages <br />scmE Civil Snimlech, <br />Clerical <br />Hours <br />COST <br />PRELIMINARY DESIGN <br />Survey and F"Smina Plottin <br />Field Survey <br />4 <br />6 <br />320 <br />Loe anon Route Control Sury and Plot NJ (By DI2) <br />330 <br />Review S Field Data <br />8 <br />$30,500 <br />Coordnation and Control of" Sub-Consulimt <br />1 <br />2 <br />8 <br />2 <br />7 <br />Prefimina Plan Submittal <br />Designer Field ion <br />4 <br />4 <br />Establish Grade Controls, are Overall Grade Profile <br />4 <br />16 <br />I2 <br />8 <br />Deli Pr ' `Geometries Pr overau Plan <br />? <br />8 <br />24 <br />32 <br />12 <br />46 <br />Utility Coordination <br />1 <br />8 <br />q <br />P Pre' ' Title & Index Shuts <br />I <br />q <br />4 <br />P Pre' T "Cross Sections <br />1 <br />2 <br />8 <br />8 <br />5 <br />5 <br />Prepare Preliminary Plan & Profile Sheets <br />2 <br />8 <br />16 <br />24 <br />19 <br />Roundabout layout and atlin Pleas <br />4 <br />16 <br />24 <br />4 <br />50 <br />48 <br />Preli ti Ri htof -Wes Desip <br />2 <br />4 <br />8 <br />Prelininary Drainage Design <br />2 <br />12 <br />1 4 <br />14 <br />Pre' Sant Sewer Dcs' n <br />1 <br />10 <br />4 <br />18 <br />Prok= Water Line Des' <br />u <br />4 <br />3 5 <br />is <br />Prepam Pre&riinary Approach & Drive Detail <br />2 <br />16 <br />Pnpam F*hnhutry Structure Data <br />4 <br />12 <br />18 <br />Pmpam Prelifttinvy Cross Sections - <br />4 <br />24 <br />24 <br />16 <br />Prepare Co teal Maintenance Of Traffic <br />2 <br />8 <br />52 <br />Preliminary Construction Cast Fstimsm <br />1 <br />2 <br />4 <br />1 <br />8 8 <br />Environmental Screenin Repoli • • HaaMat (b AS[- Group) <br />Environmental Screening Report • Hist. Arch (by ASC Group) <br />59,127 <br />Coordination and Control of Enviromnentai Sub - Consultant <br />1 <br />2 <br />2 <br />$6,330 <br />1 <br />7 <br />SUBTOTAL HOURS <br />0 <br />17 <br />76 <br />100 <br />464 <br />9 <br />746 <br />S53,957 <br />RIGHT -OF -WAY DESIGN <br />Dispositi on of Pr Plan Retie- Comments <br />1 <br />2 <br />4 <br />7 <br />Field Check Plans <br />Title Sheet and Index Sboet <br />� <br />1 <br />4 <br />5 <br />Plan & Profile Shins <br />2 <br />6 <br />24 <br />24 <br />56 <br />Signs <br />10 <br />12 <br />22 <br />Sign Structures <br />12 <br />20 <br />32 <br />Signals <br />12 <br />6 <br />18 <br />Intersection Details <br />1 <br />2 <br />4 <br />12 <br />Roundabout Devils <br />2 <br />24 <br />12 <br />24 <br />19 <br />62 <br />Retain Walls <br />2 <br />4 <br />6 <br />S ial Drainage Structures <br />1 <br />2 <br />4 <br />7 <br />Scut Sewer Details <br />2 <br />8 <br />16 <br />Waterline Details <br />2 <br />6 <br />12 <br />26 <br />10 <br />Maintenance ofTrafiic <br />2 <br />4 <br />8 <br />16 <br />t0 <br />Cross Sections <br />2 <br />8 <br />28 <br />42 <br />80 <br />Construction Cost Estimate - <br />1 <br />2 <br />4 <br />1 <br />8 <br />CoMechninl tnvestipflon (by Earth Etplomflons, Inc.) <br />Coordination and Coraml of Gcotechnical Sub- Consultam <br />1 <br />1 <br />6 <br />9 <br />$7,167 <br />Pavement Design <br />1 <br />- 4 <br />2 <br />7 <br />Utility Coordination <br />1 <br />8 <br />2 <br />2 <br />13 <br />Hydraulics and Storm Sewer Cakvlations <br />2 <br />6 <br />36 - <br />2 <br />46 <br />PreliningryConstruction Cost Estimate <br />1 <br />2 <br />8 <br />1 <br />12 <br />Field Check and Doom istion <br />- 4 <br />4 <br />2 <br />10 <br />Disposition of icid Check Review Corturierits <br />1 <br />2 <br />4 <br />8 <br />- 15 <br />Public Information Meetly aration <br />Traffic - Maintenance Plan <br />1 <br />2 <br />4 <br />7 <br />Displays <br />1 <br />4 <br />12 <br />4 <br />21 <br />Public Meeting <br />3 <br />3 <br />3 <br />9 <br />D' shion of Public Meeting Comments <br />1 <br />2 <br />4 <br />2 <br />9 <br />Legal Descriptions and Transkr Dtrcuments (by DLZ Indiana, LLC) <br />Coordinnion sad Control of RLW Sub-Consultant <br />1 <br />2 <br />,�12 <br />2 <br />2 <br />7 <br />SIBTOTAL HOURS <br />0 <br />26 <br />78 <br />213 <br />228 <br />lE <br />563 <br />5101, <br />Laaron- fisher Associairs P.C. <br />Project Fite No. 901A. 9J <br />Atqusr 1010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.