Laserfiche WebLink
L*14 Da <br />MICHAEL J. DANCH, L.A. <br />RON HARNER, PS, <br />Mr. Dave Relos <br />Staff Planner <br />Community and Bconomic <br />120' Floor County -City Bui: <br />227 West Jefferson Blvd. <br />South Bend, Indiana 46601 <br />RE: Preparation of a To <br />Ignition Park site a( <br />Street, South Bend, <br />Dear Mr. Relos: <br />I have reviewed the inl <br />property in the 1150 Block <br />be located west of and <br />approximately 5.0 acres of <br />a later date for the preparat <br />and would also include toj <br />Data Realty site. The topol <br />would cover the entire 5.0 1 <br />allow for a transition area f <br />AutoCAD version of the tol <br />The cost for the prepara <br />range of $ 2,900 to $ 3,550. <br />With project approval b; <br />days or less with permitting <br />The drawing would be <br />drawing revisions would be <br />If you have any <br />(574) 234 -4003. <br />Sincerely, <br />ichael J. D <br />President <br />Danch, Harper & Associate <br />"C" Dave Relos 2 1d Data <br />1643 Commerce Drive . South Bend, IN <br />otmce 5741234.4003 ■ 800/ 594.4003 ■ Fax 574 <br />, Harner 6 Associates, Inc. <br />Land Surveyors a Professional Engineers <br />Landscape Architects . Land Planners <br />April 13, 2011 <br />Department <br />hic Survey for the proposed Data Realty site in the <br />to Transpo property in the I ISO Block of S. Franklin <br />►rrnation you supplied for the proposed revised Data Realty <br />of South Franklin Street, South Bend, Indiana, which would <br />djacent to the Transpo site, and is proposed to contain <br />,round. We would prepare a topographic survey to be used at <br />on of engineering plans for the proposed Data Realty facility <br />o to cover the proposed utility sub - station site south of the <br />raphic survey would be tied to the 1929 Datum. The survey <br />ore site as well as a 25 ft. overlap onto adjacent properties to <br />r any required site grading. We will provide the City with an <br />ographic survey. <br />on of the Topographic Survey for this site would be in the <br />April 19th, we could have crew on site within 3.5 working <br />reather conditions, to begin the required fieldwork. <br />nt by the week of May 2nd, if not before. Any requested <br />one at our standard hourly rates, which are attached. <br />concerning this matter, please feel free to give me a call at <br />Approved By: <br />Date: <br />Inc. <br />Ity Topo Md. <br />3628 <br />!34-4119 <br />208 West Mars . Berrien Springs, MI 49103 <br />office 2691471 -3010 ■ Fax 269/471.7237 <br />L 'd 6116 6U 61.9 lauJ?H you?G WV �9 :I1 UE -£l -add <br />