My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6D(1) Resolution No. 2865
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
04-12-11 Packet
>
6D(1) Resolution No. 2865
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 4:28:34 PM
Creation date
4/11/2011 9:09:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Proposed Schedule for Task 1: <br />1. Develop Draft Community Plan — 2 Weeks from Notice to Proceed <br />2. 1St Meeting with City staff — upon completion of draft community plan <br />3. Updated Community Plan -1 week after 1St meeting with City <br />4. 2 "d Meeting with City staff upon completion of updated community plan <br />5. Public Meeting — to be scheduled by City staff after approval of community plan <br />INDOT Coordination will be throughout Phase 1. <br />Task 2 — Survey & Geotechnical Investigation: <br />This task will include a topographic survey and a geotechnical investigation, which will be <br />completed to supplement existing data for the project area. Both the survey and the <br />geotechnical investigation will be performed by a sub consultant. A utility locate with <br />relevant utilities will be conducted so the utilities are included in the survey. CBBEL will <br />coordinate the completion of the survey and geotechnical investigation. <br />Wightman Petrie Inc. is the sub - consultant for the survey. <br />Survey Fee: $37,850.00 <br />Survey Schedule: 6 Y2 weeks from Notice to Proceed <br />Earth Exploration is the sub - consultant for the geotechnical investigation. <br />Geotechnical Fee: $6,216.25 <br />Geotechnical Schedule: 6 %2 weeks from Notice to Proceed <br />Task 3 — Concept Plan Development: <br />This task will include a field review of the project site. The items reviewed may include <br />existing drainage patterns, potential utility conflict areas, existing municipal or private <br />infrastructure, and potential easement or right of way needs. <br />In completing the concept plans, which will be considered 30% design plans, CBBEL staff <br />will do the following: <br />1. Utilize the survey, available aerial photography, GIS data, and meeting comments to <br />develop the concept plans. <br />2. Provide an updated exhibit to the City showing right of way acquisition requirements <br />to complete the project. No right of way acquisition services are included. <br />3. Provide design services for additional sidewalk on the west side of High Street north <br />of Hawbaker Street and for potential drainage improvements on High Street north of <br />Hawbaker Street utilizing a lot at the southwest corner of High and Hawbaker. <br />Schedule to complete: 3 months,from receipt of survey and geotechnical report <br />It is anticipated that during the progress of this task, CBBEL will meet with the City staff and <br />other necessary local representatives to discuss the concept plan. The purpose of the <br />meetings will be to discuss and approve plan elements to accomplish project goals prior to <br />initiating full design services. Two meetings are included in the proposed fee. <br />Total Estimated Fee for Phase 1 (Tasks 1 through 3) is $177,000.00* <br />Christopher B. Burke Engineering Ltd. City of South Bend: Fellows Street Corridor Improvements <br />01.P110093.00000 Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.