My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6A(2) Proposal for painting services
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
04-12-11 Packet
>
6A(2) Proposal for painting services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 4:32:56 PM
Creation date
4/11/2011 8:23:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ZIOLICOWSKI <br />Construction, Inc <br />General Construction & Design/Build <br />Building Strafing aelation5hips Since 1974 <br />March 24, 2011 <br />David Rafmski <br />Wightman Petrie <br />412 S. Lafayette Blvd. <br />South Bend, IN 46601 <br />RE: Coveleski Stadium Improvements <br />ZCI # 14979 <br />RCO #024 <br />David: <br />Provide labor, material and equipment to paint Richey's Radiator Service Building. <br />Scope of work: <br />a. Power -wash all four CMU walls. <br />b. Perform minor grout & caulk repairs. <br />c. Apply Sherwin - Williams Loxon Block Surfacer to all bare CMU (south & east <br />elevations). <br />d. Apply two (2) coats of Sherwin - Williams Loxon AP (waterproofing system) to all CMU <br />walls. <br />e. Grind and repaint all steel lintels at doors and windows. <br />f. Prep & repaint HM doors & frames (exterior side). <br />g. Prep & repaint steel overhead door (exterior side). <br />h. Prep & repaint wood window (south elevation). <br />I. Prep & repaint utilities piping, etc. (south elevation). <br />Clarifications: <br />a. Excludes metal roof and gable siding. <br />b. Loxon XP to be applied between 14 -18 mils (wet) per coat for waterproofing performance. <br />Cost Breakdown• . <br />ZCI Painting $ 10,878.00 <br />OH &P (15 %) 1.632.00 <br />Sub total $ 12,510.00 <br />Bond (1 -1/2 %) <br />TOTAL ADD <br />188.00 <br />$12,698.00 <br />If you have any questions regarding this item, please feel free to contact our office. <br />Respectfully Submitted, <br />Ziolkowski Construction, Inc. <br />Tim Morey <br />Project Manager <br />cc: T. Marek, Site Superintendent <br />File <br />4050 Ralph Jones Drive South Bend, IN 46628 Phone (574) 287 -1811 Fax (574 234 -0151 <br />Committed to professionalism and excellence for the benefit of our clients, employees, and shareholders. <br />
The URL can be used to link to this page
Your browser does not support the video tag.