My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-11 Council Agenda & Packet
sbend
>
Public
>
Common Council
>
Common Council Agenda Packets
>
2011
>
04-11-11 Council Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2011 11:14:49 AM
Creation date
4/7/2011 11:09:44 AM
Metadata
Fields
Template:
City Council - City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
with the schedule below, with a minimum permit fee being thirty dollars <br /> $30.00 . When the total capacity of any system in any single installation is provided by more <br /> than one (1) unit, the sum of the capacities of each unit and the total number of such units shall <br /> determine the fee. <br /> Q) Space heaters, each 30,000 Btu input or more........................................ 20.00-30.00 <br /> Q Warm-air furnaces, unit heaters, cabinet heaters, and radiant tube heaters: <br /> L. Up to 300,000 Btu..................................................... 20.00 30.00 <br /> b. 300,000 Btu input or more........................................................... 30.00 40.00 <br /> Oil and gas conversions: <br /> A. Up to 300,000 Btu input................................................ 20.00 30.00 <br /> b. 300,000 Btu input or more............................................................ 30.08 40.00 <br /> f ) Electric furnaces (air handling): <br /> a. Less than 100 kw input.................................................. 20:88 30.00 <br /> b. 100 kw input or more.................................................................... 30.00 40.00 <br /> Air Conditioning: <br /> a. Central, electric: <br /> 1. Less than 5 tons..................................................... 20.00 30.00 <br /> 2. 5 to 10 tons.................................................................................39;88 40.00 <br /> 3. Over 10 tons...............................................................................50.00 60.00 <br /> b. Water chillers..................................................................................75.00 85.00 <br /> c. EMI-air blower................................................................................20.08 30.00 <br /> Ventilating and exhaust systems: <br /> a. Less than 500 CFM capacity.................................................-5-.08 6.00 <br /> b. 500 to 1,500 CFM capacity..................................................4&08 12.00 <br /> (Plus 1.00 for each 500 CFM or fraction thereof in excess of 1,500 CFM) <br /> {7,) Ventilating commercial hoods; including make up air: <br /> a. 500 CFM to 1,500 CFM capacity.........................................38:88 60.00 <br /> b. Over 1,500 CFM capacity................................................... 60.00 120.00 <br /> Refrigeration and engine-driven, gas-fired or oil-fired cooling equipment: <br /> a. 1 to 5 horsepower, each-,.....................................................15.0() 17.00 <br /> b. 6 to 10 horsepower, each......................................................25 00 30.00 <br /> c. More than 10 horsepower, each............................................40.00 45.00 <br /> Rooftop combination furnace and air conditioning units, 60,000 to 300,000 Btu's, <br /> each: <br /> a. Up to 7 %z tons.................................................................... 40.00 45.00 <br /> b. 7 %z tons or more................................................................ 60.00 70.00 <br /> Heat pumps: <br /> a. 1,000 to 60,000 Btu's input.................................... 20.00 30.00 <br /> b. 60,000 to 300,000 Btu's: <br /> 1. Up to 7 %z tons, each.................................................44:88 45.00 <br /> 2. 7 %z tons or more, each..............................................75:60 85.00 <br /> c. Earth, coupled water source...................................................50.00 60.00 <br /> Boilers, steam or hot water: <br /> a. Up to 300,000 Btu's.......... ................................ 20.00 30.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.