My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/1915 Board of Public Works Special Meeting Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1915
>
05/19/1915 Board of Public Works Special Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:42:09 PM
Creation date
8/9/2018 2:52:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/19/1915
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
664 <br />Board :net in special session at 11:00 A.M. all members present. Mr. Eli <br />Seebirt, City AtVorney^also present. <br />The Board took up for consideration the letting; of the contract for the <br />construction of the M ehigan Street Trunk sewer and said Board found that one J.H. <br />Cahill vias the lowest and best birder, therefore ordered that said contract be let <br />to said J.H. Cahill. It was further ordered that the specification filed by MN J.H. <br />Cahill with is hid being the specifications of the Merriweather Lock Joint Pipe <br />Company which shows one and two ring reinforced concrete pipe and agreeable to the <br />specifications on which bids were received, the Board now finally adopts the two ring <br />reinforced concrete pipe as per specifications which were 'filed with the City Engineer <br />May 14th.11915 and the same are hereby ordered to be made as a part of th--- specifiea,�-. <br />tions for the construction of said sewer, which specifications are as follows -t a <br />SPECIFICATIONS 141OR REINFORCED CONCRETE PIPE. <br />FORMS. <br />The fo—ms shall consist of cast iron bottom and top rings shaped to form the <br />bell spigot ends of the pipe, and sheet steel inner and outer casings, lihich shall be <br />rolled to true cylinders. The inner and outer casings shall be truly concentric °iyhen <br />the forms are assembled. The forms shall be rigidly held together and -shall have no <br />cracks extending through either the inner or outer casings, which will allow the water <br />from the concrete to run through. Butt straps must cover the joints between the adja- <br />cent sheets of the casings. <br />COVtCPFsTF,. <br />The concrete used in the manufacture of the pipes shall consist of one part <br />of Portland Cement of quality speeified,� two parts of clean sharp sand and tour parts <br />of broken stone or clean gravel which will pass through a one inch ring. <br />CEMENT. The cement used shall be a well known brand Portland Cement, with an esta- <br />blished reputation and tested to meet the requirements'of the American Society of <br />Civil Engineers' or�Canaddan Society of Civil Engineers' specifications, as the <br />engineer may direct. All cement used in the work shall be protected from the weather <br />to the satisfaction of the engineer. <br />REINFORCEe TENT. <br />The reinforcement shall consist of American Steel and 'Mire Co.'s Triangular <br />Mesh or other wire mesL of the styles and weights spe-cified or shown on the drawings. <br />The reinforcing mesh shall extend into the bell of the pipe and out of the spiF'ot <br />portion of the pipe as shown on the drawings. When two adjacent sections of pipe are <br />placed together, the fabric extending out of the spigot shall overlap the fabric ex- <br />tending into the bell in an internal recess, as shown o the drawings. <br />- MOULDING PIPE AND MIXING CONCRj,TE. <br />All concrete sL&ll be mixed in a suitable batch mixer in a manner satis- <br />factory to the engineer. Means for measuring the several kinds of ingredients shall <br />be provided so that the concrete shall be an accurate 1-2-4 mix as specified under <br />CONCRETE A. The concrete shall be placed in the -forms in small, quantities and the <br />moulding of any one piece shall be eontinous from the placing of the first concrete <br />in the fo:-ris until the pipe section is corpleted. No retempered concrete will be used <br />under' any circumstances. Sifficient water shall be used in the concrete to make a <br />wet mix and the concrete shall be thoroughly sliced or spaded as,it is being placed <br />in the forms. After the removal of the forms, the pipe shall be kept moist by <br />frequent sprinkling for several days. <br />PIPE. <br />The pipe shall be made of concrete and reinforced as specified. The <br />pipe shall be manufactured by an established manufactueer of reinforced concrete <br />pipe, who shall have had previous experience in the manufacture of reinforced con- <br />crete pipe. The pipe shall be of the full bell and spigot type and. no pipe having <br />butt joints will be considered. The reinforcement shall be placed, n.nd of the weights <br />as specified or as shown on the d.rawincz. All pipes shall conform to the dimensions <br />and contain amount of reinforcement shown o-,. drawing and in table. <br />All pipes shall be marked with the date of their manufacture Lnd no pipe <br />shall be laid that it not fourteen (14) days old. <br />
The URL can be used to link to this page
Your browser does not support the video tag.