Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name 2018 Street Paving -- ADDENDUM #1 <br />Project No. 118-070 <br />For Bids Due August 9, 2018 at 9:30 am Local Time <br />Contractor Name R:0Lkt,- Cov s4tu , ' UV- <br />ALTERNATE C (Dinan's Subdivision) BID <br />INo. tem <br />Description <br />Quantity <br />Unit <br />Price <br />Total Amount <br />1 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LS <br />$ 1,167.90 <br />$ 1,167.90 <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LS <br />$ 4,100.00 <br />$ 4,100.00 <br />3 <br />MILLING, VARIES 1.5 TO 2.5INCHES <br />3,101 <br />Sy <br />$ 3.21 <br />$ 9,954.21 <br />4 <br />HMA SURFACE, 9.5 MM - TYPE B <br />418 <br />TONS <br />$ 88.71 <br />$ 37,080.78 <br />5 <br />TACK COAT <br />3 <br />TONS <br />$ 1.00 <br />$ 3.00 <br />6 <br />JOINT ADHESIVE, SURFACE <br />2,628 <br />LF <br />$ 0.10 <br />$ 262.80 <br />7 <br />ADJUST MANHOLE TO GRADE <br />3 <br />EA <br />$ 250.00 <br />$ 750.00 <br />8 <br />ADJUST WATER LINE STRUCTURE TOGRADE <br />3 <br />EA <br />$ 250.00 <br />$ 750.00 <br />9 <br />ADJUST INLET TO GRADE <br />3 <br />EA <br />$ 100.00 <br />$ 300.00 <br />ALTERNATE C BID TOTAL: $54,368.69 <br />ALTERNATE D (Deer Hollow Subdivision) BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />MAINTENANCE OF TRAFFC <br />1 <br />LS <br />$ 1,401.47 <br />$ 1,401.47 <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LS <br />$ 5,448.00 <br />$ 5,448.00 <br />3 <br />MILLING, VARIES 1.5 TO 2.5 INCHES <br />4,962 <br />SY <br />$ 1.43 <br />$ 7,095.66 <br />4 <br />HMA SURFACE, 9.5 MM - TYPE B <br />686 <br />TONS <br />$ 87.32 <br />$ 59,901.52 <br />5 <br />TACK COAT <br />4 <br />TONS <br />$ 1.00 <br />$ 4.00 <br />6 <br />JOINT ADHESIVE, SURFACE <br />4,404 <br />LF <br />$ 0.10 <br />$ 440.40 <br />7 <br />ADJUST MANHOLE TO GRADE <br />5 <br />EA <br />$ 250.00 <br />$ 1,250.00 <br />8 <br />ADJUST WATERLINE STRUCTURE TO GRADE <br />5 <br />EA <br />$ 250A0 <br />$ 1,250.00 <br />9 <br />ADJUST INLET TO GRADE <br />5 <br />EA <br />$ 50.00 <br />$ 250.00 <br />ALTERNATE D BID TOTAL: $77,041.05 <br />Version 10/1712017 Contractor's Bid for Public Works - 4 <br />