Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name 2018 Street Paving - ADDENDUM #1 <br />For Bids Due August 9, 2018 @ 9:30 am Local Time <br />CONTRACTOR NAME: Walsk Kelly Inc. <br />ALTERNATE E (Southfield Subdivision) BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LS <br />3,909.40 <br />$ 3,909.40 <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LS <br />4,000.00 <br />$ 4,000.00 <br />3 <br />MILLING, VARIES 1.5 TO 2.5 INCHES <br />2,916 <br />SY <br />5.00 <br />$ 14,580.00 <br />4 <br />HMA SURFACE, 9.5 MM -- TYPE B <br />436 <br />TONS <br />82.90 <br />$ 36,144.40 <br />5 <br />TACK COAT <br />2 <br />TONS <br />1.00 <br />$ 2.00 <br />6 <br />1JOINT ADHESIVE, SURFACE <br />2,948 <br />LF <br />0.40 <br />$ 1,179.20 <br />7 <br />ADJUST MANHOLE TO GRADE <br />3 <br />EA <br />510.00 <br />$ 1,530.00 <br />8 <br />ADJUST WATER LINE STRUCTURE TO <br />GRADE <br />3 <br />EA <br />60.00 <br />$ 180.00 <br />9 <br />ADJUST INLET TO GRADE <br />3 <br />EA <br />425.00 <br />$ 1,275.00 <br />ALTERNATE E BID TOTAL: $ 62,800.00 <br />ALTERNATE F (Southfield Lake Subdivision) BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LS <br />1,241.90 <br />$ 1,241.90 <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LS <br />1,350.00 <br />$ 1,350.00 <br />3 <br />MILLING, VARIES 1.5 TO 2.5 INCHES <br />3,488 <br />SY <br />3.60 <br />$ 12,556.80 <br />4 <br />HMA SURFACE, 9.5 MM - TYPE B <br />485 <br />TONS <br />102.50 <br />$ 49,712.50 <br />5 <br />TACK COAT <br />3 <br />TONS <br />1.00 <br />$ 3.00 <br />6 <br />JOINT ADHESIVE, SURFACE <br />3,127 <br />LF <br />0.40 <br />$ 1,250.80 <br />7 <br />ADJUST MANHOLE TO GRADE <br />3 <br />EA <br />510.00 <br />$ 1,530.00 <br />8 <br />ADJUST WATER LINE STRUCTURE TO <br />GRADE <br />3 <br />EA <br />60.00 <br />$ 180.00 <br />9 <br />ADJUST INLET TO GRADE <br />3 <br />EA <br />425.00 <br />$ 1,275.00 <br />ALTERNATE F BID TOTAL: $ 69,100.00 <br />Walsh Kelly, Inc. <br />