Laserfiche WebLink
6 4(3 <br />1g15. Continued, <br />The City Civil Engineer filed the',following reports. <br />Estimated cost on Pipe sewer improvement in Dale Avenue From Dubail Avenue to <br />Dayton Street at.....................................................305.50 <br />Bstiffiated eott of Macadam Pavement on Tecumseh Avenue from Wakewa Avenue to Pokagon St <br />✓ at...................................................................45,854.00 <br />1 <br />City Civil Engineer filed fallowing report. <br />Regarding the attached plat of Stull's Sixt)t Addition. I beg to <br />report that I have investigated the plat and find it correct and, therefore, recom- <br />mend that it be approved. <br />Very truly, <br />WM.S.MOORE <br />City Engineer. <br />Petition filed for the Opening of Scott Street from Sample Street'to <br />✓ T.H.&L.Ry. and St. Joseph South Bend & Southern R.R. The same was read and ref- <br />ferred to the City Civil Engineer for investigation. <br />To the Hon. Board of Public Works <br />of the City of South Bend, Indiana. <br />Gentlemen: - <br />Regarding the request of Andrew Rokop asking that the Alley lying north <br />of and adjoining lots 1E,17 and 19 in Swygart's Third Addition be vacated and re- <br />located as shown by the attached blue print. Respectfully report that I have investi- <br />gated said matter and recommend that the request be granted.. <br />Very truly Yours, <br />1m. S. Moore. <br />City Engineer. <br />Clerk instructed to notir, Mr. Rokop to give deed to the City for the alley he wishes <br />f to be opened and sign waiver for one to be closed. <br />The following bid.: was received from C. H. De Frees. <br />Board of Publics Works <br />South <br />Bend,J Ind. <br />Gentlemen:- <br />a <br />I propose herewith to improve North Hichigan Street from the Forth <br />Michigan Street Bridge to Foote Street as follows <br />Asphaltic Concrete $1.40 per sq. yd. <br />Sheet Asphalt 1.50 per sq. yd. <br />Concrete over present ' <br />brick pavement . 7. GO per cu. yd. <br />All work to be done in a first class and workmanlike manner and to the' <br />entire satisfaction of the City Engineer. <br />Respect full lysubnitted, <br />C. H. DE rMES. <br />The above bid is accepted with the understanding that all concrete <br />foundation less than five 5 inches in thickness is included in price of $1.40 <br />per sq. yd. City to pay $7.00, per cubic yard. <br />Excavation bond for the sum of One Thousand (91,000.00)Dollars signed <br />J by Delbert McNabb as prinicipal and London & Lancashire Guarantee & Aedident <br />Company as sureties, was approved by the Board. n <br />` City. Cemetery Sexton Geo. M. Urey, filed with the Board a financial <br />J report up to May lst.11915. The same was read and placed on _File. <br />