My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/08/1914 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1914
>
12/08/1914 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:42:26 PM
Creation date
8/9/2018 11:32:09 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
12/8/1914
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
551 <br />Tuesday December Sth..1914. ° <br />Board met in regular session at 7:45 P.M. All members present. <br />In regard to the matter of a deferred hearing on the assessments of <br />benefits and awards of damages for the .Opening of Calvert Street from Michigan Street to <br />Main Street, under Condemnation Resolution No. 30, the Board unanimously decided to <br />rescind all proceedings for the opening of above mentioned Street. <br />In regard to the deferred hearing on assessment.roll for the Vacation <br />of alley bordering on lots 10,11,4 and So.112 lot 3 in Stover and Witwerls addition, <br />the Board unanimously decided to rescind all action on the same. <br />Mr. C. Jordon, Contractors on the Grand,Trunk RailWsyy bridge over St. <br />Peter Street, appeared before the Board and solicited the privilege of closing So. St. <br />✓ Peter Street where bridge is to be constructed for a period of Sixty (60) days. The same <br />was allowed by the Board. <br />Remonstrance received and placed on file against the opening of <br />/Calvert Street. <br />`/ Board ordered certified checks released of Loren VanderKarr on contract <br />for asphalt repair work in the City. <br />It was decided by the Board that the Contractors on'Broadway Pipe <br />sewer and on Mishawaka Trunk sewer be notified to replace all crosswalks removed by then <br />in the construction of the sewer. <br />President. <br />
The URL can be used to link to this page
Your browser does not support the video tag.