My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C(2) Resolution No. 2857
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
03-22-11 Packet
>
6C(2) Resolution No. 2857
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2012 8:10:54 AM
Creation date
3/21/2011 10:10:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ignition Park <br />Architectural and Site Design Guidelines <br />materials or techniques that will meet or exceed a LEED Silver certification or <br />equivalent, and which will result in a development pattern which is equivalent to <br />or superior to that achievable under the applicable Ignition Park guidelines; <br />2. The proposed development will be compatible with and will enhance the use or <br />value of other properties within Ignition Park; and, <br />3. The proposed development is consistent with and contributes to the overall image <br />of Ignition Park as a "launching pad for technological innovation" for the City of <br />South Bend. <br />All findings specified above for the granting of a waiver of the Architectural and Site <br />Design Guidelines shall be reduced to writing, signed by an authorized representative of <br />the ARB, and included as part of any application submitted for approval to the Executive <br />Director of the Area Plan Commission or application for a building permit from the <br />Building Commissioners of the City of South Bend. <br />BDDBO 1 6344433v2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.