Laserfiche WebLink
Tuesday July:29th.,1914. <br />Board met in regular session at 10:00 A.M. Mr. A. H. ,Rice, , absent. <br />Bids were received, opened and read for the pipe sewer on Indiana Avenue from <br />f Leer h:Street to Marine Street under IMp roveme nt Resolution No. 325. The same were <br />referred to the. City Engineer for tabulati,on'to be ,reported back to the Board at 7:45 <br />P.M. of this date. <br />Bids were received opened and read for pipe sewer on Blaine. Avenue and Terrace <br />Avenue from Woodward Avenue to Vassar Avenue, under IMprovement "Resolution No. 323. The <br />vame was read and referred to the City Engineer for tabulation to be reported on at <br />7:45 P.M. Of this date. <br />Bond and contract for pipe sewer on Broadway and High Street under_ Improvement <br />Oesolution No 320, signed by Hoban and Roach as -principal and American Surety Company <br />of New York, was approved by the Board. <br />Bond and contract for pipe sewer on Donald Street from .Witwer Avenue to Mich. <br />St. under improvement Resolution No. 3P1.. signed by Staples and Ackerman asprincipal <br />and American Surety Company of New'York as surety, was approved by the Board. <br />The Engineer filed the following reports on the estimated cost of improvements. <br />I herewith submit the estimated cost of the pipe sewer on Dubail Avenue from <br />✓ Miami Street to Carroll Street at...........................................$7,487.50 <br />I herewith submit the estimated cost of the pavement improvement do the First <br />,/ Alley north of Washington Avenue from Walnut Street. to Studebaker Street at ..... $1,296.00 <br />I herewith submit the estimated cost of the pipe sewer improvement in Pulaski <br />Street from Division Street to Ford Street at................................$3,079.70 <br />I herewith submit the estimated cost of the pipe sewer improvement in Calvert <br />✓ Street from the Bowman Creek Trunk sewer to Witwer Avenue at ................$3,923.70 <br />Petition filed with the Board for a pa vement on Euclid Avena.e from Le Porte <br />Avenue to Brick Avenue. The same was read and referred to the City Engineer for investi— <br />gation. <br />The City Enginneer filed the following reports on petitions. <br />Regarding the petition of 0. D. Hughes et al for the construction of sewer on <br />Kline Street. I recommend that the petition be granted. The Board ordered a resolution <br />prepared on the same and set for a hearing. <br />Regarding the petition of W. J. Scott et al for pavement of Johnson St. from <br />Michigan Avenue to Vassar Ave. I recommend tha-i, the petition be granted. Street and <br />alley intersect ons are estimated at $300.00 The Board ordered a resolution prepared on <br />same and set for a hearing. <br />Regarding the petition of Chas. E. Singler et al for the opening of alley^West of <br />Notre Dame Avenue from Corby Street to City Limits. I recommend the petition. be granted. <br />V/ The Board ordered a resolution prepared and set for a hearing. <br />Regarding the attached petition of Chas. Weidler for gradeand walk on Donald <br />JStreet. I recommend that the walk be granted. The Board ordered a resolution prepared <br />on same and set for a hearing. <br />Communication received read and placed on file from the South Bend Young Men's <br />Chamber of Commerce in regard to letting of the heating contract to the Indiana and <br />Michigan Electric Company. <br />