Laserfiche WebLink
`t 15- <br />Bid of L. H. Webster for repairing sewer on East La .Salle Avenue from <br />St. Peter Street to the alley east of St. Peter Street, was filed with the Board and the <br />same approved. <br />Complaint of alley at end of Francis Street being about two feet higher <br />f that sidewalk was reported on by the Street Commissioner as follo*s' Sidewalk and curbs` <br />have been put in and street and alley not graded. The same was placed on file. <br />The Street Commissioner reported as follows on the Councilts motion of July <br />13th.,1914. to repair sidewalks on W. Wash. Ave. from Chapel Lane to Circle Ave on south <br />side of Avenue. Brick walks at 1112-1120-1308-1310-and 1312 were in fairly good con- <br />dition* Walk at 1040 W. Washington Avenue in very bad condition. The Board ordered a <br />thirty day notice sent to repair same. <br />Brick walk on Circle Averue east to cement walk just east of Feasor(s Coal office and Which <br />belongs to the L.S.&M.S. RY. Co. in very bad condition. The Board ordered a thirty day <br />notice sent to repair same. <br />Street Commissioner renorted. thpt t'?!e brick pavement on Studebaker Is right <br />of way and Tutt Street west where same.:joins planking, in a defective condition. The <br />Board ordered that the Studebaker Company be giming a notice to repair same. <br />The Board ordered that the L.S.'M.S.Ry. Co. and the Three Le Ry. Co. be <br />notified to repair crossing at Walnut and Harris Street. <br />The Street Commissioner reported that sidewalk at 924 S. Main Street on <br />Sample Street side is caved in and in a defective condition. A notice was ordered sent <br />to have same repaired within thirty days. <br />Contract for the pipe sewer on Broadway, and High Street from Bowman Creek <br />to Carroll Street, was awarded to Hoban and Roach for the sum of...........$52359.20 <br />Contract for pipe sewer on Donald Street From Witwer Avenue to Michigan <br />Street, was awarded to Staples and Ackerman, Contractors for the sum of.....$573.40 <br />The following report was filed with the Board on the 15 inch sewer 100 <br />feet west of Lafayette Street to Leland Avenue on Marion. Also 9 inch sewer on Lafayette <br />J St. from Marion to Navarre Street. The Street Commissioner reported the above mentioned <br />in perfect condition in dry weather, but in case of roots in 15 inch sewer making trouble <br />during a storm will try 4 lines of hose for an experiement. <br />Engineer filed assessment roll and final estimate for pipe sewer on Vassar <br />Avenue from Portage Avenue to Riverside Drive, Under ImprOvement Resolution No. 311. In <br />✓ the City of South Bend, Indiana. <br />Resolved, that notices as to the amounts of assessments be published on the <br />25th., day of July,1914, and on the 1st. day of Au gust,1914 in the South Bend Daily <br />Tribune, stating that this Board will givea hearing on the amount of such assessments <br />at its office in the City Hall on the llth., day of August21914 at 7:45 P.M. <br />Resolved further, that the entire work under the above contracts be accepted <br />and approved and the final estimate thereon allowed. Notice of this resolution shall be <br />published on the 25th., day of July,1914. and on the 1st. day of August,1914 in the South <br />Bend Daily Tribune, stating that this Board will give a hearing on the acceptance of such <br />work atrits office in the City Hall on the llth., day of August,1914 at 7:45 P.M. <br />