My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/23/1914 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1914
>
06/23/1914 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:30:29 PM
Creation date
8/2/2018 12:19:48 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
6/23/1914
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�84 <br />Board met in regular session at 10:00 A.M. Mr. Rice absent: <br />f Bids were received, opened and read for curb and walk and grade for same on <br />�I Orange Street from Sadie Street to Olive Street, under Improvement Resolution No. 315. <br />The same were referred to the City Civil Engineer for tabulation to be reported back on <br />this date at 7:45 P.M. <br />Bids were received, opened and read for curb and walk and grade for same on <br />Wilber Street from Longley Avenue to Michigan Avenue, under Improvement Resolution No. <br />316. The same were referred to the City Civil Engineer for tabulation to be reported <br />back on this date at session at 7:45 P.M. <br />A complaint was received from N. F. Hozinski living on Birdsell Street in <br />regard to water standing north of Chicago,Lake Shore & South Bend Ry. Company's tracks <br />on Birdsell Street. The Street Commissioner reported that catch basins should be <br />placed at the p61nt.`mentioned above. The Clerk was instructed to send? a thirty <br />day notice on sameto the Chicago, Lake Shore and South Bend Ry. Company .` <br />Communication received from The Chicago, Lake Shore & South Bend Ry. Com- <br />pany in regard to relaying brick between their tracks on Main and LaSalle Avenue <br />instead of asphalt. The same was read and all action on same deferred until the. <br />even ng.session at 7:45 P.M. <br />Communication received from the Chicago, South Bend & Northern Indiana Ry. <br />Company in regard to the rebate on pavement on La Salle Avenue. All' action on the same <br />was deferred until evening session at 7:45 P.M. <br />(( Resignation of Mr. A. P. Perley as Clerk was received by the Board, the <br />1 same was accepted and placed on file.' <br />Communication received from J. C. Birdsell of the Birdsell Mfg. Company <br />Jin regard to the filling of excavation and the replacing of their fence on High Street <br />by the Contractor of the Bowman Creek Trunk sewer Stewart -Sheets Company, as per agree- <br />ment made with the City for the crossing of their propertyy with the Bowwan Creek Trunk <br />sewer. .'The Clerk was instructed to obfain a report on the above condition and <br />present at evening session at 7:45 P.M. <br />Complaint filed with the Board in regard to defective condition of <br />lcurb on Portage Avenue on east side of street about 250 ft from Cemetery. A notice <br />was ordered sent to H. N. Barnes, Contractor on said work in the fall of 1913 to repair <br />the same as soon as possible. <br />The Chicago, South Bend and Northern Indiana Ry. Company was ordered <br />.� to be notified to remove surplus dirt which was put on street vdien constructing their <br />tracks on East Madison Street east of Eddy Street, there being a complaint presented ;to <br />the Board in regard to the above condition. <br />The following cowtunication was presented to the Board by the City Clerk. <br />Board of Public Works <br />South Bend, Indiana. <br />Gentlemen: - <br />At the regular meeting of the Common Council held on the 22nd. day of <br />June 1914, the following motion prevailed <br />JMOTION BY COUNCILMAN GOEBEL (Verbal) <br />I move that the Board of Public Works be instructed to notify The <br />Studebaker Corporation to keep cinders from washing onto the Sample Street sidewalks. <br />The above matter was referred to the Street Commissioner for investigation. <br />The Street Commissioner reported on the following walks <br />Brick walk at 213 and 215 E. Keasey Street in front of Harlan ro ert <br />P P y <br />needs repairs. Notice ordered to repair same. <br />
The URL can be used to link to this page
Your browser does not support the video tag.