My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Completion Affidavit - WWTP Digester Gas Utilization - Project No. 116-050R - Thieneman Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Project Completion Affidavit
>
Project Completion Affidavit - WWTP Digester Gas Utilization - Project No. 116-050R - Thieneman Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 10:23:04 AM
Creation date
7/25/2018 10:16:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the OWNER allows the Surety to correct said defects, the Surety shalt have sixty (60) days thereafter within <br />which to take such action as it deems necessary to insure performance of the CONTRACTOR's obligation. <br />If such defects are not corrected after the time period specified in the notice or after the expiration of <br />the sixty (60) day time period, whichever is applicable, the OWNER shall have the right to correct the defects, <br />and the CONTRACTOR and Surety, jointly and severally, shall pay all costs and expenses incurred by the <br />OWNER in correcting the defects, including, but not limited to, [lie ENGINEER, legal and other costs, <br />together with any damages either direct or consequential, which the OWNER sustains, or may sustain, on <br />account of the CONTRACTOR's failure to correct the defects. in addition, the OWNER shall have the right to <br />contract for the correction of said defects and, upon acceptance of a bid in accordance with the OWNER's <br />normal bidding process, the CONTRACTOR and Surety shall become itninediutely liable for the amount of <br />the bid. In. the event that the OWNER conunences legal proceedings for the collection thereof, interest shall <br />accrue on said amount at the rate of six (6) percent per annum, beginning at the commencement of said legal <br />proceedings, <br />if the OWNER commences suit for collection of any sums due hereunder, the CONTRACTOR and <br />Surety, jointly and severally, agree to pay all costs and expenses incurred by the OWNER, including, but not <br />limited to, attorney's fees. <br />IN WITNESS WHEREOF, the h parties have caused this instrument to be signed and sealed by their <br />respective authorized officers this day o'f Jan -201 . <br />CONTRACTOR: SURETY: <br />Thieneman Construction, Inc. <br />By: 4��do - <br />K,j,,j t•,..Tvt 0 "7`E.fra,,5•M A J <br />Title: PP-MSZ.Oer%)i <br />Address: <br />Western Surety Company <br />By: <br />Title: Brenda Johns on; A orney in Fact <br />Address: 333 S Wabash Avenue T <br />Chicago, IL 60604 <br />WITNESS AS TO CONTRACTOR <br />SB WWTP Digester Gas Utilization Design <br />Project No. 116»050 R 00 61 31-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.