Laserfiche WebLink
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, <br />and Site conditions that may affect cost, progress, and performance of the Work. <br />C. Bidder is familiar with and is satisfied as to all Laws and Regulations that may affect cost, <br />progress, and performance of the Work. <br />D. Bidder has carefully studied all: <br />1. reports of explorations and tests of subsurface conditions at or contiguous to the Site <br />and all drawings of physical conditions relating to existing surface or subsurface <br />structures at or contiguous to the Site (except Underground Facilities), if any, that have <br />been identified in the Supplementary Conditions in SC-4.02 as containing reliable <br />"technical data", and <br />2. reports and drawings of Hazardous Environmental Conditions identified at the Site, <br />if any, that have been identified in SC-4.02 as containing reliable "technical data". <br />E. Bidder has considered the information known to Bidder, information commonly known to <br />contractors doing business in the locality of the Site, information and observations obtained <br />from visits to the Site, the Bidding Documents, and the Site -related reports and drawings <br />identified in the Bidding Documents with respect to the effect of such information, <br />observations, and documents on <br />1. the cost, progress and performance of the Work <br />2. the means, methods, techniques, sequences and procedures of construction to be <br />employed by Bidder, including applying any specific means, methods, techniques, <br />sequences, and procedures of construction expressly required by the Bidding <br />Documents to be employed by Bidder; and <br />3. Bidder's safety precautions and programs. <br />F. Based on the information and observations referred to in Paragraph 3.01.D, Bidder does not <br />consider that further examinations, investigations, explorations, tests, studies, or data are <br />necessary for the determination of this Bid for performance of the Work at the price(s) bid <br />and within the times required and in accordance with the other terms and conditions of the <br />Bidding Documents. <br />G. Bidder is aware of the general nature of work (if any) to be performed by Owner and others <br />at the Site that relates to the Work as indicated in the Bidding Documents. <br />H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and <br />discrepancies that Bidder has discovered in the Bidding Documents, and the written <br />resolution thereof by Engineer is acceptable to Bidder. <br />03029038.0000 0041 13-12 <br />