Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name Miami Basin Drainage Improvement Project <br />Project No. <br />For Bids Due <br />BASE BID <br />116-082C <br />July 24, 2018 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Mobilization and Demobilization <br />1 <br />LS <br />$ 166,125.00 <br />$ 166,125.00 <br />2 <br />Clear Right of Way <br />1 <br />LS <br />$ 8,006.00 <br />$ 8,006,00 <br />3 <br />Tree, Remove <br />7 <br />EACH <br />$ 867.00 <br />$ 6,069.00 <br />4 <br />Gate, Remove <br />2 <br />EACH <br />$ 255.00 <br />$ 510.00 <br />5 <br />Concrete Drive, Remove <br />2 <br />EACH <br />$ 1,733.00 <br />$ 3,466.00 <br />6 <br />Sidewalk, Remove <br />95 <br />SYS <br />$ 16.00 <br />$ 1,520.00 <br />7 <br />Curb, Remove <br />183 <br />LFT <br />$ 11.00 <br />$ 2,013.00 <br />g <br />Excavation, Common <br />280 <br />CYS <br />$ 49.00 <br />$ 13,720.00 <br />9 <br />Borrow <br />710 <br />CYS <br />$ 51.00 <br />$ 36,210.00 <br />10 <br />Sediment, Remove <br />630 <br />CYS <br />$ 125.00 <br />$ 78,750.00 <br />11 <br />Water Quality Structure Maintenance <br />3 <br />EACH <br />$ 1,020.00 <br />$ 3,060.00 <br />12 <br />Topsoil <br />242 <br />CYS <br />$ 54,00 <br />$ 13,068.00 <br />13 <br />No. 2 Stone <br />140 <br />TON <br />$ 18.00 <br />$ 2,520.00 <br />14 <br />Temporary Seeding <br />7,260 <br />SYS <br />$ 0.33 <br />$ 2,395.80 <br />15 <br />Temporary Silt Fence <br />540 <br />LFT <br />$ 2.00 <br />$ 1,080.00 <br />16 <br />Geotextile for Subgrade, Type 1A <br />1,320 <br />SYS <br />$ 6,00 <br />$ 7,920.00 <br />17 <br />Compacted Aggregate, No 53 <br />360 <br />TON <br />$ 41.00 <br />$ 14,760.00 <br />18 <br />HMA Patching, Type A <br />17 <br />TON <br />$ 326.00 <br />$ 5,542.00 <br />19 <br />PCCP Pavement, 9 in. <br />380 <br />SYS <br />$ 91.00 <br />$ 34,580.00 <br />20 <br />Fence Gate, Cantilevered, 24` <br />2 <br />EACH <br />$ 765.00 <br />$ 1,530.00 <br />21 <br />Sidewalk, Concrete <br />80 <br />SYS <br />$ 82.00 <br />$ 6,560.00 <br />22 <br />Curb and Gutter, Concrete, Type B <br />110 <br />LFT <br />$ 55.00 <br />$ 6,050.00 <br />23 <br />Curb, Integral, Concrete <br />117 <br />LIFT <br />$ 52.00 <br />$ 6,084.00 <br />24 <br />Riprap, Class 1 <br />366 <br />TON <br />$ 103.00 <br />$ 37,698.00 <br />25 <br />Riprap, Revetment <br />100 <br />TON <br />$ 104.00 <br />$ 10,400.00 <br />26 <br />Mulched Seeding, U <br />1,817 <br />SYS <br />$ 1,00 <br />$ 1,817.00 <br />27 <br />Sodding <br />357 <br />SYS <br />$ 13.00 <br />$ 4,641.00 <br />Version 10/17/2017 Contractor's Bid for Public Works —7 <br />