Contractoes Sid der' FWWork - City of South Hand
<br />Prct],cl No. 117,0038
<br />!NoTth
<br />July 16, 2018
<br />Off -Street Parking Lot at Wayne St. and St. Louis Blvd
<br />City Project No, 117-0838
<br />City of South Bend'
<br />Bid Tabulation
<br />Bassett!
<br />Engineers Estimate
<br />Rafth-Riley
<br />It Kelly, Inc.
<br />Item
<br />Nm
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Amount
<br />Unitiorkto
<br />Amount
<br />1 Unit Prim
<br />Amount
<br />1, Conalsucdon
<br />Engineering
<br />1
<br />1.9
<br />I.M.
<br />64,787.67
<br />SAS"100
<br />sax5o
<br />--
<br />34
<br />;7ags
<br />$am&95
<br />2.
<br />M+"fizadcnMemoetkation
<br />I
<br />LS
<br />6.00%
<br />$15,198.95
<br />$0,27800
<br />$6.27aoo
<br />$19awba
<br />$19,800.00
<br />3. Or
<br />. Schedule
<br />I
<br />LS
<br />$1,000.00
<br />$1,00000
<br />Moo
<br />$350,00
<br />SM.00
<br />$36O.D0
<br />4. CF
<br />M Monlilty Update
<br />7
<br />MO
<br />$260,00
<br />$11750.00
<br />MIce
<br />$515.00
<br />1150A0
<br />$360.00
<br />5, 21Isda"
<br />Hightofway
<br />I
<br />Ls
<br />0,01)0,00
<br />$5.000.00
<br />$8.000.00
<br />$01)(100
<br />$1101-10
<br />11„50000
<br />8 lTa
<br />e, Rarno", 4T
<br />1
<br />EACH
<br />SI80D.00
<br />$I.woloo
<br />$2,550,00
<br />52,550z0
<br />$2,200.1)(1
<br />$2,800 00
<br />T. conveto
<br />Pa,atinent'll-I
<br />125
<br />SYD
<br />$15.00
<br />s1.875,00
<br />460.00
<br />$1,600-00
<br />$11,00
<br />$1,3760D
<br />& Sir,
<br />ml Sign, Relocate
<br />3
<br />EACH
<br />IisM00
<br />$900.00
<br />$269.00
<br />$607.00
<br />$179.00
<br />$53700
<br />in
<br />9. m1i
<br />tProtecdon
<br />5
<br />EACH
<br />5200.00
<br />31,1)00.00
<br />$200.00
<br />$IA(lodo
<br />$85.00
<br />S32600
<br />10. It
<br />nponuy Erosion and SedmwtCwW
<br />I
<br />US
<br />$2,000.00
<br />$�000.00
<br />$3.000.00
<br />$3,D9O.00
<br />$650.00
<br />$M00
<br />Go
<br />Dmon ls�ucn
<br />2,790
<br />CYO
<br />$2000
<br />$5a,40%00
<br />526.00,
<br />"",
<br />$35.60
<br />$90,04500
<br />12 Cc
<br />npacted Aggregate lor Base, No, 63
<br />1,260
<br />TON
<br />$25.00
<br />SMGM00.00
<br />$29.00
<br />ila?,120.00
<br />$2&00
<br />$33,200.00
<br />ys, HK
<br />A Sudace, 9.5mrR Type B
<br />310
<br />TON
<br />$85.00
<br />MA"'01)
<br />$125,00
<br />$39.750.00
<br />$103.00
<br />$31,930.00
<br />14. H
<br />h A Intann"ate, 10.13nun, Type D
<br />620
<br />TON
<br />$00.00
<br />64%600.01)
<br />$KOO
<br />$44.720.00
<br />$41.00
<br />$M,440.00
<br />15. Souawsk
<br />Concuate. 4'
<br />15
<br />SYD
<br />110400
<br />SWO.00
<br />V00,00
<br />$1,500.00
<br />$irmoo
<br />$z2woo
<br />Is,
<br />�eto Curb, 6'
<br />1,096
<br />UFT
<br />$2200
<br />$24,112.00
<br />$27.00
<br />$20,02.00
<br />$40�00
<br />$43,04040
<br />17. P,
<br />GP f"Appiosch", 6"
<br />66
<br />SYD
<br />$60M
<br />$4,000.00
<br />$63M
<br />$4,2114.110
<br />$80.00
<br />$5,440.00
<br />18.
<br />ld rQ
<br />425
<br />SYD
<br />$8.00
<br />$Z55"a
<br />$8.10
<br />$3,44260
<br />SIZI)a
<br />IM.M.75
<br />Is,
<br />d" Seeding, Type U
<br />ISO
<br />SYD
<br />$100
<br />$320.00
<br />$415
<br />$680.00
<br />$12.96
<br />$2.013,60
<br />20. Tn
<br />a, Freeman Red Maple. 2V
<br />3
<br />MH
<br />$P,20.00
<br />101660.01)
<br />$5415.00
<br />$1,635.00
<br />wo.00
<br />$1.6w.00
<br />21,
<br />r a, Shumard Oak, 2.5'
<br />It
<br />EACH
<br />MOM
<br />56AM-00
<br />$645.0D
<br />$5,995.00
<br />M.00
<br />1101105.00
<br />22. 1K
<br />rpsWErdOWM
<br />1
<br />LSUM
<br />$Z500.00
<br />$2,00.00
<br />$3.30(koo
<br />$3,M.00
<br />$4,900.w
<br />$4,900.0D
<br />23.
<br />24.
<br />4, Sewer'Pipe, I V, P.dontled
<br />1; ndafd DrMell, 1,80* gallon
<br />339
<br />5 1
<br />_I:E_
<br />tFT
<br />1140.00
<br />$4.600M
<br />$20,340M
<br />$2ZW.00
<br />$76.00
<br />$-1,05000
<br />$26,4142.00
<br />$A251)roll
<br />$69.00
<br />$000100
<br />$23,391.00
<br />$33,0=0
<br />_H,
<br />26,
<br />VC Schedule 80, wait Pub
<br />V. Pont, Pahring, Lot
<br />220 1
<br />-11
<br />LFT
<br />E.ACH
<br />$tD.00
<br />$2,00040
<br />$2,200.00
<br />VAMM
<br />$4.98
<br />",717,0
<br />$1.095.60
<br />"'77740
<br />$4.98
<br />$S,771,00
<br />$1,096.60
<br />"'Moo
<br />27.
<br />- (o No, 4 CappetCoMe,
<br />341
<br />$8.00
<br />$2,72a.00
<br />SSM
<br />$1,977.80
<br />$6.1to
<br />$1,977.80
<br />28,
<br />VC Schedule 80 for Ughtng
<br />341
<br />M.00
<br />$3,410,00
<br />$4V
<br />sips,80
<br />$4XG
<br />$106'"
<br />29. Ug
<br />I Pole Assembly end Foundation
<br />i t
<br />5
<br />PA
<br />EACH
<br />CH
<br />S:kMOD
<br />$I%%Q100
<br />$2,058.00
<br />$I0,2$0J)Q
<br />$2.0fti)(1,
<br />$10,290-00
<br />fA
<br />celfaneousEqtApmntfiwUghbg
<br />I
<br />I
<br />LS
<br />LS
<br />$1,000lO0
<br />$IAW.00
<br />$1,682.00
<br />$1,68100
<br />$i7681007
<br />$1,882,00
<br />31. Sh
<br />et Sign and Post
<br />7
<br />EACH
<br />$0040
<br />$3.360,00
<br />$179,00
<br />$1,2$1,00
<br />;170400
<br />$1,263100
<br />!2. LLn
<br />33. Un,,
<br />% Paim, SorW, Whke. 4"
<br />Paint Sold, YellaN, 4'
<br />F1.345
<br />660
<br />LFT
<br />LIFT
<br />$1.00
<br />ODD
<br />31,U5.00
<br />tisso.00,
<br />$0.45
<br />$0.66
<br />$M6.26
<br />$429.00
<br />$030
<br />$0.30
<br />$40340
<br />111911.00
<br />34. Ps
<br />amnt Message Marking, Paint ADA SMW
<br />4
<br />EACH
<br />M.00
<br />31,200.00
<br />MOO
<br />$120M
<br />$40.00
<br />$160.00
<br />Po
<br />ement Message Mvylr9F Paint Lero IndEudon Anw
<br />EACH
<br />$300.00
<br />11900.00
<br />$36.00
<br />$105.00
<br />1116100
<br />$48.00
<br />�35.
<br />30rrrr
<br />mus Curb. Remove
<br />342
<br />LIFT
<br />VZOG
<br />$4,104.00
<br />M.00
<br />$6,840.00
<br />$5.00
<br />$2,736,00
<br />37- Shjb.
<br />VAntr Gem Vo-esod, W Ht.
<br />59
<br />1 MH
<br />a
<br />$66.01)
<br />93,835.00
<br />$7500
<br />$4,425.00
<br />R al - Base Bid
<br />$323,965.82
<br />$379,988,95
<br />$39%750.D0
<br />M=
<br />. 11N
<br />it yes Yes
<br />-a MIF-
<br />WE
<br />
|