Laserfiche WebLink
Contractor's Bid for PublicWork- City ofSouth Bend <br />Project No. 117-083B <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Addendum No. 1 <br />June2018 <br />PROJECT NAME Off -Street Parking Lot at <br />Wayne St. and St. Louis Blvd <br />PROJECT NUMBER 117-083B <br />FORBIDS DUE July 10, 2018 <br />Base <br />Bid <br />Item <br />No. <br />Description <br />Quantit <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />$ 6,800.OD <br />$ 6,800.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />$ 6,270.00 <br />$ 6,270.00 <br />3. <br />CPM Schedule <br />1 <br />LS <br />$ 350.00 <br />$ 350.00 <br />4. <br />CPM Monthly Update <br />7 <br />MO <br />$ 85.00 <br />$ 595,00 <br />5. <br />Clearing Right ofWay <br />1 <br />LS <br />$ 8,000.00 <br />$ 8,000.00 <br />6, <br />Tree, Remove,48" <br />1 <br />EACH <br />$ 2,55D.00 <br />$ 2,550.00 <br />7. <br />Concrete Pavement Removal <br />125 <br />SYD <br />$ 6000 <br />$ 7,500.00 <br />8. <br />Sheet Sign, Relocate <br />3 <br />EACH <br />$ 269.00 <br />$ 807.00 <br />9, <br />Inlet Protection <br />5 <br />EACH <br />$ 200.00 <br />$ 1,000.00 <br />10. <br />Temporary Erosion and Sediment Control <br />1 <br />LS <br />$ 3,OOD,OD <br />$ 3,000.00 <br />11. <br />Common Excavation <br />2,790 <br />CYD <br />$ 25.00 <br />$ 69,750.00 <br />12, <br />Compacted Aggregate for Base, No. 53 <br />1,280 <br />TON <br />$ 29 0o <br />$ 37,120.00 <br />13, <br />HMA Surface, 9.5 mm, Type B <br />310 <br />TON <br />$ 125.00 <br />$ 38,750.00 <br />14, <br />HMA Intermediate, 19.5 mm, Type B <br />520 <br />TON <br />$ 86,00 <br />$ 44,720.00 <br />15. <br />Sidewalk, Concrete, 4" <br />15 <br />SYD <br />$ 100.00 <br />$ 1,500.00 <br />16. <br />Concrete Curb, 6" <br />1,096 <br />LIFT <br />$ 27.00 <br />$ 29,592.00 <br />17. <br />PCCP for Approaches, 6" <br />68 <br />SYD <br />$ 63.00 <br />$ 4,284,00 <br />18, <br />Sodding <br />425 <br />SYD <br />$ 8.10 <br />$ 3,442.50 <br />19. <br />Mulched Seeding, Type U <br />160 <br />SYD <br />Is 4.25 <br />$ 680.00 <br />20. <br />Tree, Freeman Red Maple, 2,5" <br />3 <br />EACH <br />$ 545.00 <br />$ 1,635,00 <br />21. <br />Tree, Shumard Oak,2.5" <br />11 <br />EACH <br />$ 545.00 <br />$ 5,995.00 <br />22. <br />Dumpstor Enclosure <br />1 <br />LSUM <br />$ 3,300.00 <br />$ 3,300.00 <br />23, <br />Storm Sewer Pipe,18", Perforated <br />339 <br />LFT <br />$ 78.00 <br />$ 26,442.00 <br />Bidder's Name: Rieth-Riley <br />Version 7-31/2015 Contractor's Bid For Public Works-7 <br />