My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Traffic Control Device - Extend Traffic Calming for Riverside Drive and Hudson Avenue
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Traffic Control Devices
>
Traffic Control Device - Extend Traffic Calming for Riverside Drive and Hudson Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 11:21:25 AM
Creation date
7/11/2018 3:01:56 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
7/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Request for Approval of <br />Traffic Control Device(s) <br />Date: June 28, 2018 <br />I hereby submit the following installation or change of traffic control devices for review: <br />Traffic Request Number: N/A <br />n <br />New Installation <br />n Removal <br />El Revision <br />El <br />Stop Sign <br />El Stop Sign <br />[:] Stop Sign <br />El <br />Yield Sign <br />E]Yield Sign <br />F1 Yield Sign <br />* <br />Speed Limit, mph <br />El Speed Limit, —mph <br />El Speed Limit, —mph <br />* <br />Other, List <br />El Other, List <br />El Other, List <br />Traffic Calming --- Riverside and <br />Hudson Traffic Circle <br />Location(s): Intersection of Riverside Drive and Hudson Avenue <br />This has been submitted: <br />F-1 in response to request by a citizen/ neighbor/ passerby: <br />E In response to an internally -generated concern fi-om: Jitin Kain <br />Remarks: The Riverside and Hudson Traffic Circle was installed as a part of a 90-day demonstration project, utilizing <br />rubber curbing and traffic cones, Requested to continue installation of traffic circle until October 31, 2018, when <br />rubber curbing will be removed to accommodate for winter snow removal. Revisions to layout will be made <br />based on a developing plan for future permanent installation. <br />Submitted & Proposed by: <br />Theresa E. Harrison, PE, ENV SP a a M. Eloyles,'PhD l <br />Traffic Engineer tail Engine <br />Date: Date: '�17r ( lb [ <br />APPROVED: SOUTH IWND BOARD OF PUBLIC <br />WORKS <br />Gary A. ilot, Preside, <br />'-S1fzaifha M. Frffzbdg, Membei�' <br />James A. Mueller, M mber <br />h eta A. Maradik, Member <br />Therese J.456rau, ~Member <br />Distribution: <br />Bureau of Traffic and Lighting <br />South Bend Police Department Traffic Division <br />Theresa E. Harrison, Traffic Engineer <br />Attest: <br />Linda M. Martin, Clerk <br />11 // e) k) 6 / V <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.